STEP 7 (See Diagram 7 & Cable Loop Diagram)
A.) Insert the tip of the 127” Lower Cable (#41) through the opening on the Foot Plate (#26) to the opening on the Vertical Frame Base (#9).
B.) Attach a Small Pulley (#58) to the opening. Attach the Foot Plate to the Frame. Align the holes and secure the Foot Plate, Vertical Frame Base, and the Small Pulley with one
M10 x 2 ¾” Allen Bolt (#93), two Ø 1” x ¾” Pulley Bushings (#53), and one M10 Aircraft Nut (#90). Secure the Foot Plate to the Vertical Frame Base with one M10 x 2 ½” Carriage Bolt (#84), Ø ¾” Washer (#89), and M10 Aircraft Nut (#90).
C.) Draw the Cable underneath the Pulley to the open bracket on the Vertical Frame Base. Install a Pulley (#59) with a M10 x 1 ¾” Allen Bolt (#78), two Ø ¾” Washers (#89) and one M10 Aircraft Nut (#90).
D.) Draw the Cable around the Pulley then upward to the Double Floating Pulley Bracket (#21) previously installed in
E.) Draw the Cable around the Pulley then downward to the open bracket on the back of the Rear Vertical Frame (#8). Install another Pulley.
F.) Draw the Cable around the Pulley and upward to the Single Floating Pulley Bracket (#36) previously installed in
G.)Connect the Long Chain (#71) to the Cable with a
16