Smeg AS73CES manual Installation, Appropriate installation locati- on

Page 5

2Installation

Refer to the nearest Authorised Service Agent for installation of your product. CPreparation of location and electrical installation for the product is under

customer’s responsibility. BInstallation and electrical connections

must be carried out by a qualified personnel.

APrior to installation, visually check if the product has any defects on it. If so, do not have it installed. Damaged products will cause risks for your safety.

Appropriate installation locati- on

• Install the product in an environment which has no risk of freezing and is in a stable and level position.

• Operate your product in a well ventilated, dust-free environment.

• Do not block the air ducts in front of and under the product with materials such as long pile rugs and wooden bands.

• Do not place your product on a long pile rug or on similar surfaces.

• Do not install the product behind a door with a lock, sliding door or a hinged door which can strike the product.

• Once the product is installed, it should stay at the same place where its connections have been made. When installing the product, make sure that the rear wall of it does not touch anywhere (tap, socket, etc.) and also pay attention to install the product at a place where it will stay permanently.

BDo not place the product on top of the power cable.

Keep at least 1.5 cm distance to walls of other furniture.

Ventilation hose and connecti- on (for products equipped with an outlet vent)

Ventilation hose allows exhaust air from inside the machine

Vented dryer has 1 air outlet.

Stainless sheet metal or aluminum pipes can be used instead of a hose. The pipe diameter should be minimum 10 cm.

Maximum hose and pipe lengths are given in the table below.

 

Hose

Pipe

 

 

 

Maximum length

4 m

5 m

1 elbow 45°

-1.0 m

-0.3 m

1 elbow 90°

-1.8 m

-0.6 m

1 elbow 90° short

 

-2.7 m

1 wall passage

-2.0 m

-2.0 m

CEach elbow and other passages should be subtracted from the maximum length stated above.

To connect a ventilation hose;

1. Connect the air outlet hose to the hose spacer piece by turning it counterclockwise.

2. Make the hose passages as shown below.

CExhaust of humid air from the dryer into the room is inconvenient. It may damage the walls and furniture in the room.

CThe ventilation hose can be routed outdoors via a window or it can be connected to the air outlet in the bathroom.

CAir outlet hose must be routed directly to the outdoors. There must be a limited number of elbows as not to hinder ventilation.

CTo prevent water accumulation in the hose, make sure that it is not folded on the floor.

5 - EN

Image 5
Contents AS73CES Read this manual prior to initial operation of the product General safety Important safety informationIntended use Children’s safetyAppropriate installation locati- on InstallationConnection to water drain Products with a condenser Electrical connection Adjusting feetFirst use Disposing of packaging mate- rialDisposing of the old machine Transportation of the machineThings to be done for energy saving Initial preparations for dryingLaundry unsuitable for drying MachineCorrect load capacity Preparing laundry for dryingLoading Selecting a Programme and Operating Your Machine Programme selection Preparing the machineProgram selection and consumption table Starting the programme Time delayAuxiliary function Progress of programChild-proof lock Adding/removing laundry in standby modeChanging the programme after it has started End of programme Technical SpecificationFinishing by canceling the programme Water tank Products equipped with a condenser Maintenance and cleaningCover filter For the condenser products with a condenser Solution suggestions for problems Foam Seal Dryer Built Under KIT Assembly Instructions