KitchenAid PROLINE FRONT-LOADING ELECTRIC DRYER manual Optional 3-wire connection

Page 12

When connecting to the terminal block, place the hooked end of the wire under the screw of the terminal block (hook facing right), squeeze hooked end together and tighten screw, as shown.

1.Loosen or remove center silver-colored terminal block screw.

2.Place the hooked end of the neutral wire (white or center wire) of direct wire cable under the center screw of terminal block (hook facing right). Squeeze hooked end together. Tighten screw.

C

Optional 3-wire connection

Use for direct wire or power supply cord where local codes do not permit connecting cabinet-ground conductor to neutral wire.

1.Remove center silver-colored terminal block screw.

2.Remove neutral ground wire from external ground conductor screw. Connect neutral ground wire and the neutral wire (white or center wire) of power supply cord/cable under center, silver-colored terminal block screw. Tighten screw.

BC

B

A

D

A

D

E

A. External ground conductor screw

B. Neutral ground wire

C. Center silver-colored terminal block screw

D. Neutral wire (white or center wire)

E. ³⁄₄" (1.9 cm) UL listed strain relief

3.Place the hooked ends of the other direct wire cable wires under the outer terminal block screws (hooks facing right). Squeeze hooked ends together. Tighten screws.

4.Tighten strain relief screw.

5.Insert tab of terminal block cover into slot of dryer rear panel. Secure cover with hold-down screw.

6.You have completed your electrical connection. Now go to “Venting Requirements.”

E

F

A. External ground conductor screw

B. Center silver-colored terminal block screw C. Neutral ground wire

D. Neutral wire (white or center wire) E. ³⁄₄" (1.9 cm) UL listed strain relief

F. Grounding path determined by a qualified electrician

3.Connect the other wires to outer terminal block screws. Tighten screws.

4.Tighten strain relief screws.

5.Connect a separate copper ground wire from the external ground conductor screw to an adequate ground.

6.Insert tab of terminal block cover into slot of dryer rear panel. Secure cover with hold-down screw.

12

Image 12
Contents Table of Contents PRO Line FRONT-LOADING Electric DryerTable of Contents Dryer Safety Your safety and the safety of others are very importantInstallation Instructions Toolsand PartsOptions Dryer Dimensions Installation spacingLocation Requirements You will needMobile home Additional installation requirements Mobile home installations requireElectrical Requirements It is your responsibilityIf using a power supply cord If connecting by direct wireIf your outlet looks like this Power Supply Cord Direct Wire Disconnect powerStyle 1 Power supply cord strain relief Make ElectricalConnectionWire connection Power supply cord Style 2 Direct wire strain reliefWire connection Direct wire Remove center silver-colored terminal block screwBDE CG F Optional 3-wire connection If using an existing vent system Venting RequirementsIf this is a new vent system Vent material Alternate installations for close clearances Special provisions for mobile home installationsVent system chart 1 rigid metal vent only Plan VentSystemInstallVent System Complete InstallationConnect Vent Level DryerDryer USE Starting Your DryerTo use an Automatic Cycle To make changes during an Automatic CyclePausingor Restarting Stopping Your DryerControlLocked Drying and Cycle TipsCycles Additional Features TemperatureDryingRack Cleaning the DryerLocation Cleaningthe LintScreenEvery load cleaning As needed cleaningCleaningthe Dryer Interior Cleaning the DryerExteriorRemoving Accumulated Lint Vacation and MovingCareTroubleshooting Dryer OperationAssistance or Service U.S.AKitchenaid PRO Line Dryer Warranty Five -YEAR Parts and Labor Limited WarrantyItems Kitchenaid will not PAY for Disclaimer of Implied Warranties Limitation of Remedies