
CH270 Installation Supplement Contents
The following checklist and information sheets are provided to help you properly and efficiently install your CH270 sonar. If this is a high speed vessel, please pay careful attention to the tube length and fairing instructions.
Page
3Fiberglass (FRP) sonar tube installation outline drawing
7Tank guide assembly installation and adjustment instructions
8Motion sensor mounting, location and longer interconnect cables
8Soundome cover removal and oil installation reminder
9Checking soundome when in drydock
Please feel free to contact us with any questions that you may have. Additional information such as this may be found on our web site www.Furuno.com.
This material is provided to augment, not replace, what is found in your CH270 manuals.