Furuno manual CH270 Installation Supplement Contents

Page 2

CH270 Installation Supplement Contents

The following checklist and information sheets are provided to help you properly and efficiently install your CH270 sonar. If this is a high speed vessel, please pay careful attention to the tube length and fairing instructions.

Page

1-2 Overall installation checklist - Please return a completed copy to Furuno U.S.A.

3Fiberglass (FRP) sonar tube installation outline drawing 4-6 High speed hull, sonar tube fairing pictures with comment

7Tank guide assembly installation and adjustment instructions

8Motion sensor mounting, location and longer interconnect cables

8Soundome cover removal and oil installation reminder

9Checking soundome when in drydock

Please feel free to contact us with any questions that you may have. Additional information such as this may be found on our web site www.Furuno.com.

This material is provided to augment, not replace, what is found in your CH270 manuals.

Image 2
Contents Important Technical Installation Information Please read this supplement to the CH270 Manual firstCH270 Installation Supplement Contents CH270 Installation Check Sheet Vessel Information CH270 System InformationOperator Training Page Sonar tube fairings for high speed vessels Page Page Page Soundome Cover Removal and Replacement Motion Sensors, Inclinometers Longer Interconnect CablesChecking Soundome When In Dry Dock