Masterbuilt 20050412 manual Performed each time gas cylinder

Page 9

ASSEMBLY

STEP 17

Slide drip cup (24) onto drip cup

bracket (30). Drip cup is needed to

collect grease run-off.

30

24

ASSEMBLY

26

A

25

5

Some parts not shown for clarity.

STEP 3

Attach control panel (5) to right front leg (25) as shown using screws (A).

Repeat on opposite side attaching

contol panel (5) to left front leg (26).

 

 

STEP 18

 

 

Hang matchstick (22) on side of

 

 

smoker body (1) as shown.

 

 

Assembly is complete!

 

 

Perform soapy water test to check

 

 

for gas leaks before use (see pg 3).

 

1

Note: Soapy Water Test MUST be

22

performed each time gas cylinder

 

 

is connected to burner/hose or

 

 

 

 

each time it is used.

STEP 4

Position burner box (6) over center hole in bottom of smoker body, carefully aligning venturi over valve orifice as shown. Attach burner box to smoker body using screws (A).

Firmly attach ignition wire to piezo ignitor on control panel as shown in Figure B.

6A

Venturi

Valve Orifice

Ignition Wire

Piezo Ignitor

Figure B

15

8

Image 9
Contents Carbon Monoxide Hazard Dual Fuel Smoker Model This Product is for Outdoor USE onlyLimited Warranty General Warnings and Safety InformationBeef Smoking ChartSoapy Water Test Warnings & Procedures Recipes Match Light Instructions REGULATOR, Burner and GAS Valve Connection & OperationWood Flavor Poultry Fish HAM Beef Pork Lamb Quantity DescriptionDual Smoker Operation Replacement Parts ListHardware List Charcoal SmokingAssembly PRE-SEASON InstructionsStep Performed each time gas cylinder Mount drip cup bracket 30 to smoker body 1 using screws G Tighten all hardware at this time Carefully position smoker as