Summit 42369 dimensions Frame Inches 610mm Any Surface

Page 11

 

 

 

ASSEMBLY

11

 

 

 

 

 

6

 

CAUTION: Use two people to lift and install the Summit® Built-In frame assembly.

 

a.)

Lift the frame assembly into the “island” structure opening. Make sure the frame is resting level on the fi nished surface of the

 

 

structure.

 

b.)

Adjust the Front Vent to rest squarely on ground.

 

 

c.)

Apply a bead of silicone sealant (1) around the perimeter and front edges of the grill that are in contact with the “island”

 

 

 

structure. This will prevent moisture seepage. The sealant you use must have a temperature rating above 120°F (48.8° C).

 

 

 

 

 

 

 

 

 

 

 

Any Surface

24 inches (610mm)

 

Note: For a countertop treatment

 

 

 

 

 

inches24 (610mm)

Recommended 3/4 inch (19.1 mm)

(610mm)

24inches

overhang. Notch front edge for

 

 

 

frame to fully slide in.

a.

Frame

c.

(1)

24 inches (610mm)

Any Surface

24 inches (610mm)

Frame

24 inches (610mm)

b.

Image 11
Contents Clearance from Surfaces or Structures BUILT-IN LP GAS Grill Installation GuideLocating Your Grill General Construction Details BUILT-IN Cutout DimensionsParts List Parts List Exploded View Platinum D4 Exploded View Platinum D6 Exploded View List Platinum D6 Exploded View List Platinum D4Assembly Assembly Assembly Frame Inches 610mm Any Surface 12ASSEMBLY ASSEMBLY13 Match Holder Drill Bit Assembly BUILT-IN GAS Line Locations Typical Bulk Propane GAS Supply InstallationGAS Supply Test Connections Typical 20 LP Propane GAS Supply InstallationGAS Line Piping GAS Supply WEBER-STEPHEN Products CO Connect GAS SupplyVentilation