Bretford LAP30EBA manual Offset Front-left Clip Front-right Bottom shelf

Page 19

offset

front-left

clip

front-right

bottom shelf

Step 3

Carefully install replacement E-Unit(s) into position by placing bottom in first against the offset and tilting it in sideways to the top.

When repositioned correctly, the E-Unit(s) power switch should face the front.

Reinstall the E-Unit bracket assemblies (make sure that the top flange of the E-unit is aligned with the slot in the bracket assembly) and tighten screws securely.

From underneath the bottom shelf, feed the E-Unit power cord(s) [plug end] all the way through the bottom rear round grommeted cutout(s) [next to bracket assembly].

Press each E-Unit power cord into the two wire clip(s) located [in line, behind E-Unit] on the bottom of cart. Wind power cord(s) around the cord wrap bracket on the exterior rear panel for storage.

Installation is now complete and ready for use.

Image 19
Contents Front to Rear Unit RepositioningDetail a Detail C Detail D Cutout window Clip-rear Round cutout Detail E Unit Repositioning Rear to Front Front View Detail D Detail F Offset Clip Unit Replacement Rear Location Front View Detail C Cutout window Clip-rear Round cutout Detail E Unit Replacement Front Location Bracket Assembly Clip Offset Front-left Clip Front-right Bottom shelf Timer Replacement E-UNIT AT Rear Location Step Filler bracket Bracket Unit Cord Timer cord Bottom flange- timer/bracket Detail C Timer Installation E-UNIT AT Front Location Front-left Front-right Detail B Bottom flange- bracket assembly Step Detail C Full row side Offset Front-left Front-right Bottom shelf Label Installation Be Sure to Record Your Combination PAD Lock Door