Desa (V)KC36NE Illustrated Parts Breakdown, Models KC36NE, VKC36NE, KC36PE and VKC36PE

Page 30

30

ILLUSTRATED PARTS BREAKDOWN

Models KC36NE, VKC36NE, KC36PE, VKC36PE

ILLUSTRATED PARTS BREAKDOWN

MODELS

KC36NE, VKC36NE, KC36PE AND VKC36PE

21

24

22

7

 

6

23

4

8

1

9

11

3

14

16

15

5

1210

13

2

19

20

18 17

www.desatech.com

116238-01A

Image 30
Contents For Your Safety For Your Safety What to do if YOU Smell GASTable of Contents Safety InformationProduct Identification Local CodesProduct Features PRE-INSTALLATION PreparationLocation and Space Requirements Vent ClearancesFraming and Finishing Specific venting clearancesLocation of Termination CAP Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsMale Female Slots Locking Lugs Installation PlanningHorizontal Termination Installation CenterHorizontal Vent Cap Wood ScrewInterior Wall Surface Firestop Vent Cap Vent PipeHorizontal Termination Configurations Recommended Applications Corner ground floor installation Over 12 horizontal pipeTermination is possible Venting with Two 90 Elbows Connect a section of pipe and extend up through the hole Installation for Vertical TerminationFlat Ceiling Installation Roof Flashing Wall Strap Elbow Ceiling FirestopVertical Termination Configurations Elbow Into inner collar fireplace as shownHigh Altitude Installation Installing Optional Blower Accessory Venting InstallationFireplace Installation Check GAS Type Desa 5/8 Pipe & Vent KitsBy turning knob fully counterclockwise before continuing Fireplace InstallationModel BKT Installation Decal on the firebox bottom approximately 12 in frontInstalling GAS Piping to Fireplace Location Blower Wiring DiagramInstallation Items Needed Connecting Fireplace to GAS Supply Pressure Testing Gas Supply Piping SystemChecking GAS Connections Removing Louver Panels Pressure Testing Fireplace Gas ConnectionsREMOVING/REPLACING Glass Door Bubbles forming show a leak. Correct all leaks at onceInstalling Lava Rock and Glowing Embers Cleaning Glass DoorRemoving Glass Door Optional Remote Control Installing Brick Liner Models BL36DASA and BL36DHASAWall Switch Installation Replace top and bottom louversLighting Instructions Wiring DiagramOperating Fireplace Equipment PilotOptional Remote Operating Optional Blower AccessoryTo Turn OFF GAS To Appliance OperationPilot and Burners Cleaning MaintenanceGlass Door LogsTroubleshooting Improper vent configuration PositionBL36DHASA for log removal Restrictions or obstructionTechnical Service Replacement PartsService Hints Parts Under WarrantySpecifications Illustrated Parts Breakdown Models KC36NE, VKC36NE, KC36PE and VKC36PEParts List Left Refractory Brick PanelRear Refractory Brick Panel Illustrated Parts Breakdown KEY Part Number Description Accessories Brand ModelDate Purchased Serial Number Industrial Drive Box Bowling Green, KY 116238-01A Warranty Information Model Serial No Date PurchasedIndustrial Drive P.O. Box