I X . D I S A S S E M B L Y A N D A S S E M B L Y
Toggle Latch Release
1.Push in the toggle latch release button while pulling back the toggle latch. See figures 16 and 16A.
2.Position the toggle latch buckle over the top of the toggle latch. See figure 16B.
Frame Separation
1.Lower the tiller to the PMV floorboard.
2.Push back on the seat post to pivot the PMV’s rear section rearwards until the rear section is standing vertically on its bumper. See figure 17.
3.Lift the front section up until the lower pegs are no longer in the slots. See figure 18.
4.Carefully move the front sec- tion away from the rear section.
TOGGLE | TOGGLE LATCH |
LATCH | RELEASE |
| BUTTON |
Figure 16. Toggle
Latch (Latched)
| TOGGLE LATCH |
| BUCKLE |
Figure 16A. Toggle | Figure 16B. Buckle |
Latch (Unlatched) | Secured |
SLOT |
PEG |
Figure 18. Separating The
Frame Sections
Figure 17. Frame Positioning
ASSEMBLY
1.Position the front and rear sections of your PMV as shown in figure 19.
2.Align the lower slots of the front section with the corresponding pegs on the front of the rear section. See figure 19.
WARNING! Position the
3.Holding the seat post, slowly pivot the rear section forward until the curved locking brackets are fully con- nected onto the top rear pegs. See figure 17.
4. | Raise the tiller. | PEG CURVED LOCKING |
5. | Latch the toggle latch. See figure 16A. | BRACKET |
| ! Lower the toggle latch buckle. |
|
| ! Push back on the toggle latch so it locks into place. |
|
6. | Reinstall the batteries into the battery wells and reconnect the |
|
| battery strap. |
|
7. | Connect the |
|
| harnesses. | |
8. | Reinstall the shroud. | Figure 19. Frame Sections |
9. | Reinstall the seat, and lock it into place. |
|
34 | www.pridemobility.com | Hurricane |