Diamond Power Products DPS6500 manual Page6, Step Six, Arrange Battery Cables

Page 7

DP

Step Six

ARRANGE BATTERY CABLES

Connecting To The Truck’s Battery

Red Or Black Heat

Strip 3/8”

 

 

 

Apply Heat To Shrink

 

 

 

 

 

 

 

 

 

 

 

 

Positive Or Negative

Shrink Tubing

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Battery Cable

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

APU-HVAC

Control Harness

Copper Lug

Using The Correct Crimping Tool Crimp

And Solder Copper Lug To Battery Cables

Negative (-Black)

Ground Cable

12 VDC Power Supply Harness

Back View Of APU

Ensure That the battery terminals are clean and free of corrosion.

If not, remove and clean them.

Apply an dielectric grease to prevent corrosion. Apply anti-corrosion paint over cable ends.

Truck Batteries

Teck Cable

Positive (+Red)

12 VDC Battery Cable

WARNING: Do not join the APU battery connections until the installation is complete and the APU is ready to test-start.

WARNING: Make sure the 120 VAC cable is connected to the installed CCU (if applicable). Terminate cable ends if no CCU is installed.

WARNING: Make sure that the polarity is correct before attaching battery leads. (The APU connects to 12VDC systems only).

Page6

Image 7
Contents Auxiliary Power Unit Installation Guide Page1 Read Before Starting InstallationStep One Mounting the APU InstallingPage2 Step TwoMounting the Condenser Condenser InstallationPage3 Step ThreeStep Four Page4Plumb the APU to the Main Engine Step Five Installing the Fuel LinesInstalling The Stand Pipe Page5Page6 Arrange Battery CablesStep Six System Check Completing the InstallationPage7 Step Seven