Pelco manual C3419M-B 11/06

Page 5

7.Install the back box by compressing the spring clips and pushing the back box through the hole. Tighten the screws until you hear a clicking noise.

WARNING: An electrical short in the back box may occur if the metal BNC connector is not completely covered by the protective boot.

8.Connect wiring to the circuit board inside the back box. When finished, close the door to the back box and turn on the power. The green LED will light.

NOTES:

Aux 1: Maximum 2 A at low voltage (<40 V)

Aux 2: Maximum 30 mA at 32 VDC

If you are using both unshielded twisted pair (UTP) wiring and a translator board, install the UTP wiring before installing the translator board.

C3419M-B (11/06)

5

Image 5
Contents Heavy-Duty Spectra IV Series Installation AC/DC C3419M-B 11/06 C3419M-B 11/06 Switch 1 Dome Drive TroubleshootingSpecial Systems Switch SettingsTable F. Switch Settings for SW1, P-Type Control 100 111 191 General SpecificationsC3419M-B 11/06 Product Warranty and Return Information ISO9001