All models are shipped from the factory with the following:

1.Zero clearance to combustibles

2.Multi-speed direct-drive blower.

3.Blower Speed Relay.

4.Horizontal or Down flow duct connections.

The unit dimensions are shown in Figure 3.

Optional field-installed electric heater kits are available in 9 kw and 15 kw heating capacities. A separate installation instruction document for the electric heaters and their application accompanies this one. A two stage heat 24VAC thermostat should be used with electric heater kits installed.

SAFETY CONSIDERATIONS

It is the responsibility of the installer to ensure that the installation is made in accordance with all applicable local and national codes.

!WARNING:

Improper installation, service, adjustment, or maintenance may cause explosion, fire, electrical shock or other hazardous conditions which may result in personal injury or property damage. Unless otherwise noted in these instructions, only factory authorized kits or accessories may be used with this product. Noncompliance may void the unit’s warranty.

Labels, Tags — When working with this equipment, follow all precautions in the literature, on tags, and on labels provided with the unit and/or approved field installed kits. The type of hazard and severity are described on each label or tag.

Pressures Within The System — This equipment contains liquid and gaseous refrigerant under high pressure. Installation or servicing should only be performed by qualified trained personnel thoroughly familiar with this type equipment.

INSTALLATION REQUIREMENTS

Equipment Check — Before beginning the installation, verify that the unit model is correct

for the job. The unit model number is printed on the data label. All units have been securely packaged at the point of shipment. After unpacking the unit, carefully inspect it for apparent and concealed damage. Claims for damage should be filed with the carrier by the consignee.

Requirements and Codes — The installer must comply with all local codes and regulations which govern this type equipment. Local codes and regulations take precedence over any recommendations contained in these instructions. All electrical wiring must be made in accordance with local codes and regulations and with the National Electric Code (ANSI/NFPA

70)or in Canada the Canadian Electric Code Part 1 CSA C.22.1. Air Ducts must be installed in accordance with the standards of the National Fire Protection Association “Standards for Installation of Air Conditioning and Ventilation Systems” (NFPA 90A), “Standard for Installation of Residence Type Warm Air Heating and Air Conditioning Systems” (NFPA 90B), these instructions and all applicable local codes.

NFPA publications are available by writing:

National Fire Protection Association

Batterymarch Park

Quincy, Maine 02269

Unit Location — The Q4 series heat pump is designed only for outdoor installations. Choosing the location of the unit should be based on minimizing the length of the supply and return ducts. Consideration should also be given to availability of electric power, service access, noise, and shade. Sufficient clearance for unobstructed airflow through the outdoor coil must be maintained in order to achieve rated performance See Figure 4 for minimum clearances to obstructions.

Air Filters — A suitable air filter must be installed in the return air system. Air filter pressure drop must not exceed 0.08 inches w.c. at 300 fpm.

Condensate Drain — Condensate is removed from the unit through the 3/4" female pipe fitting located on the front side of the unit. (See Figure 5.) Install a 2 inch condensate trap in the drain line of the same size and prime with water. When connecting rigid drain line, hold the female fitting with a wrench to prevent twisting. Do not over tighten! Refer to local codes and restrictions for proper condensate disposal requirements.

5

Image 5
Contents Volt Q4 Series Installation InstructionsTable of Contents Winter Heating Summer Cooling Owner InformationOperating Instructions SpecificationsTo Operate Your Heat Pump For Cooling To Operate Your Heat Pump For HeatingInstallation Requirements Safety ConsiderationsSide View Back View Top ViewAIR Ducts Unit InstallationGround Level Installation Electrical WiringLow Voltage Connections Start UP and System Check Start-Up ProcedurePre-Start Check List System CoolingUnit Maintenance Q4 Blower Curves Typical Thermostat ConnectionHeat Pump in Heating Q4SA Heating Charging ChartsQ4SA-060 Charging ChartsHeat Pump in Cooling Q4SA Cooling Charging ChartsQ4SA-060 Q4SA CoolingField Installed Accessory Kits Q4 AccessoriesThree Phase 60Hz ¢707885W¤