JBL FM52, FM62, FM8SUB, FM65C, FM82 setup guide Existing Construction

Page 5

Existing Construction

 

Level

 

Template

 

Tape

Step One:

Step Two:

Remove the grille from the

Determine the correct speaker

speaker frame.

location.

Kerf Line

 

1-1/2"

1-1/2"

1-1/2"

Step Three:

Determine the speaker-frame location.

Step Four:

Cut the dry wall.

Step Seven:

Connect the speaker wires to the baffle assembly and install baffle assembly in frame.

Do not overtighten the baffle screws.

Step Five:

Place the mounting bracket on the speaker frame using the mounting guides (marked 3/8", 1/2", 5/8", and 3/4") corre- sponding to the thickness of the dry wall.

Step Eight:

Replace the metal grille.

Step Six:

Place the frame assembly in the wall.

Image 5
Contents FM8SUB FM8SUB subwoofer One. Speaker PlacementTwo. Speaker Connections Wire Length Recommended SizeThree. Installation Existing Construction New Construction After the Drywall is InstalledStep Five Step Six Cut the drywall ScrewsStep One Step Ten Step NinePainting the Speaker Frame and Grille Troubleshooting Sensitivity Amplifier PowerImpedance Crossover FrequencyPart No. Fmom