Installation procedures

Installation of fall-prevention fitting metal:

Fix the fitting metal to the wall by screws so that there is no clearance between them. With the unit set up vertically, fix the fitting metal to the unit with screws while making an adjustment at the long portion of the hole so that there is no clearance between the upper surface and the fitting metal.

Installation of L-shaped metal

Fix to the unit by screws so that there is no clearance between the fitting metal and the unit.

After confirming that the unit has been set up vertically to the floor, fix it to the floor by bolt.

Piping connection

1.Connecting method

Apply refrigerant oil at half union and flare nut.

To bend a pipe, give the roundness as large as possible not to crash the pipe. When connecting pipe, hold the pipe centre to centre then screw nut on by hand, refer to Fig.

Be careful not to let foreign matters, such as sands enter the pipe.

Forced fastening without centering may

damage the threads and cause a gas leakage.

Pipe dia

Fastening torque

 

 

 

Liquid pipe 9.52mm(3/8")

42N.m

Gas pipe 19.05mm(5/8")

110N.m

 

26

Image 29
Contents Packaged unit Operation ContentDisposal of the old air conditioner Page Parts Indoor unitManual Operation Machine is Adaptive in Following Situation OperationRemote-controlled Operation Unit starts running AutoManual Operation CoolingRemote-controlled Operation DryHeating Fan Sleep Timer ON/OFF Timer on/off operationTimer ON-OFF Timer on-off functionAir flow adjustment Unit operation Operation hintsOn OFF Energy savingON/OFF Air filter cleaning MaintenanceAfter season maintenance Followings are not problems Trouble shootingPower supply failure? switch is not Set at on When problems occur?Indoor & outdoor unit connection Indoor & outdoor unit connection Tools necessary Tools necessaryDisplay of whole unit Installation proceduresOutdoor Unit Installation of indoor unitIndoor Installation of fall-prevention fitting metal Installation procedures 10m 15m 20m 25m 30m Electric wiring Others