FIGURE 5
WALL MOUNTING INSTRUCTIONS
WALL STRUCTURE
FACTORY SUPPLIED RAIN
FLASHING. MOUNTON UNIT
BEFOREINSTALLATION
SUPPLYAIR
DUCT
RETURN AIR
OPENING
SEE FIGURE 3 – MOUNTING INSTRUCTIONS
SUPPLY AIR | SUPPLY AIR |
OPENING | OPENING |
RETURN AIR | RETURN AIR |
OPENING | OPENING |
BOTTOM MOUNTING
BRACKET. MOUNT ON
WALL BEFORE
INSTALLING UNIT.
FIGURE 6
WALL MOUNTING INSTRUCTIONS
SEE UNIT DIMENSIONS, FIGURE 1,
FOR ACTUAL DIMENSIONS
ATTACH TO TOP
PLATE OF WALL
1.000” CLEARANCE ALL AROUND
SUPPLY DUCT
OPENING
INTERIOR FINISHED
WALLOVER FRAME
1.000” CLEARANCE ALL AROUND
EXTERIOR FINISHED WALLOVER FRAME
RETURN DUCT |
OPENING |
FRAMING MATERIAL
2 X 4’S, 2X 6’SAND/OR STRUCTURAL STEEL
ATTACH TO BOTTOM
PLATE OF WALL THIS STRUCTURAL MEMBER LOCATED TO MATCH STUD SPACING FOR REST OF WALL. A SECOND MEMBER MAY BE REQUIRED FOR SOME WALLS.
Manual