Dometic CARAVAN MODEL B3200 operating instructions Passed Dielectric

Page 10

AIR CONDITIONER WIRING DIAGRAM

PASSED

DIELECTRIC

FAN CAP

ID

BRN

BRN

1

BLK

2

YEL

3

RED

4

BLU

5

WHT

6

WHT

7

GR/YL

1 2 4 ROTARY

L1 C H SWITCH

BLU

 

 

WHT

BLK

 

 

 

 

GRY

 

 

3

 

 

4

 

 

TSTAT

 

NEUTRAL(N)

GR/YL

ACTIVE(L)

EARTH( )

 

 

JUNCTION

 

 

BOX

220/240 VAC 50 HZ, 10

USE COPPER CONDUCTORS ONLY

GR/YL

 

COMPRESSOR

 

 

 

C

RUN CAP

MOTOR

ID

WHT

R

S

 

 

 

 

 

 

 

O.L.

WHT

 

 

 

 

RED

 

 

 

 

 

RED

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

COMP STARTER

START

 

 

CAP

PTCR

RED

 

*

 

 

 

3105595.015

AIR BOX WIRING DIAGRAM

 

 

FAN CAP

 

GR/YL

 

 

 

COMPRESSOR

 

 

ID

BRN

 

 

 

 

 

C

 

 

 

 

 

 

 

 

 

 

 

 

RUN CAP

 

 

 

 

 

 

 

 

MOTOR

 

 

 

 

 

 

 

 

 

WHT

R

S

 

 

 

 

 

ID

 

 

 

BRN

 

 

 

 

 

 

 

 

 

 

 

 

 

O.L.

 

 

 

 

 

 

 

 

 

BLK

1

 

BLK

 

 

 

 

 

 

2

 

 

 

 

 

 

 

YEL

 

YEL

 

WHT

 

 

 

 

3

 

 

 

 

RED

RED

 

RED

 

 

 

4

 

 

 

 

RED

 

 

 

 

 

 

 

 

BLU

 

BLU

 

 

 

 

 

 

5

 

 

COMP STARTER

 

 

WHT

 

WHT

 

 

 

 

 

 

START

 

 

 

 

6

 

 

 

PTCR

 

 

WHT

 

WHT

 

CAP

 

 

 

 

 

 

 

 

GR/YL

7

 

GR/YL

 

*

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HEAT ACCESSORY

 

 

 

WHT

 

 

 

LIMIT SWITCH

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

BLK

 

BLK

 

 

 

 

GR/YL

 

2

 

 

 

 

 

 

 

 

 

3

WHT

BLK

 

 

 

 

 

 

 

 

LIMIT SWITCH

ELEMENT

 

 

 

 

 

 

 

 

 

 

 

 

FACTORY WIRING

 

 

 

 

 

 

 

FIELD WIRING

 

 

 

 

 

 

 

LINE SPLICE

 

 

 

 

 

 

 

3105580.025

31

Image 10
Contents Model Understand Signal Words Safety InstructionsRecognize Safety Information General InformationInstallation Instructions Choosing Proper Location For The Air ConditionerRoof Preparation Placing Air Conditioner On The Roof Installing The Air Conditioner Operating Instructions Air Distribution Box Installation Controls Fan Operation Customer MaintenanceCooling Operation Heating Operation If so equippedRoof Mount Assembly Air Conditioner Passed Dielectric