Porter-Cable 7518, 7519 instruction manual Templet Guides

Page 11

899750 - 02-14-02.qxd 9/24/02 7:43 AM Page 11

BB

C

D D

A

Fig. 6

TEMPLET GUIDES

A wide variety of templet guides are available for use in pattern and templet routing operations. Fig. 7 shows a typical combination bit, templet guide, and locknut.

CAUTION: DISCONNECT TOOL FROM POWER SOURCE.

To install, insert templet guide in center hole in router base and secure in place with the locknut.

BEFORE CONNECTING ROUTER TO POWER SOURCE: Install, bit, adjust depth of cut, and rotate router chuck by hand to be sure bit or collet do not contact templet guide.

LOCKNUT

BASE

ROUTER BIT

SUB-BASE

 

 

TEMPLET GUIDE

 

 

 

Fig. 7

11

Image 11
Contents Double Insulated Work Area General Safety RulesElectrical Safety Personal SafetyTools USE and Care ServiceSpecific Safety Rules and Symbols for Routers Extension Cord Selection Replacement PartsMotor Selecting the BIT Functional DescriptionForeword Assembling the Motor in the Router Base AssemblyInstalling and Removing the BIT Connecting to Power Source Adjusting Depth of CUTSoft Start OperationTo Start and Stop Router Overload ProtectionEdge Guide Using the RouterTemplet Guides Maintenance Accessories PORTER-CABLE Limited ONE Year Warranty Canadian PORTER-CABLE Delta Service Centers