Porter-Cable BN125A instruction manual Clearing a Jammed Fastener, Nose Cushion

Page 8

Fig. 20

Fig. 21

CLEARING A JAMMED FASTENER

1.CAUTION: Disconnect tool from air supply.

2.Open magazine and remove any remaining fasteners.

CAUTION: Remove fasteners from tool before opening the fastener guide plate. Fasteners are under pressure and may shoot out of magazine which could cause injury.

3.Depress the quick release latch and open the fastener guide plate (see Fig. 20).

4.Remove the jammed fastener (see Fig. 21).

5.Depress the quick release latch, close the fastener guide plate, and release the latch.

NOSE CUSHION

This tool is equipped with a rubber nose cushion (A) Fig. 22, that prevents marring of finished surfaces by the metal safety during normal operation. The nose cushion can be removed and stored in the rear area of the magazine (B) Fig. 22, when it is not required.

CAUTION: Disconnect tool from air supply before removing or reinstalling rubber nose cushion.

Fig. 22

B

A

8

Image 8
Contents Instruction Brad Nailer manual Important Safety Instructions Read and Follow ALL InstructionsPage Page Technical Specifications Power SourceEMPLOYER’S Responsibilities Operating InstructionsUsing the Tool Preparing the ToolPage Clearing a Jammed Fastener Nose CushionMaintenance TroubleshootingClean and Inspect Daily Service and RepairsAccessories PORTER-CABLE Limited ONE Year WarrantyDelta Service Centers