Grizzly G0682 Items Needed for Setup, Unpacking, Description Qty, ™ EdlZgAic\fjebZci

Page 12

SECTION 3: SETUP

This machine presents serious injury hazards to untrained users. Read through this entire manu- al to become familiar with the controls and opera- tions before starting the machine!

Wear safety glasses dur- ing the entire setup pro- cess!

This machine and its com- ponents are very heavy. Get lifting help or use power lifting equipment such as a forklift to move heavy items.

"&%"

Items Needed for

Setup

Description

Qty

™

6hh^hiVcih################################### 6hCZZYZY

™

HV[Zin<aVhhZh;dg:VX]EZghdc########&Eg#

™

A^[i^c\HigVehGViZY[dgViaZVhi)%%aWh#

dei^dcVa##################################################### '

™ EdlZgA^[i^c\:fj^ebZci

GViZY[dgViaZVhi)%%aWh#Dei^dcVa######## & ™ =ZmLgZcX])bb####################################### & ™ LgZcX]Zh&(!(%bb############################&:V# ™ GViX]ZiHdX`ZiHZi&(bb###################### &

Unpacking

Ndjg bVX]^cZ lVh XVgZ[jaan eVX`V\ZY [dg hV[Z igVchedgiVi^dc# GZbdkZ i]Z eVX`V\^c\ bViZg^Vah [gdb VgdjcY ndjg bVX]^cZ VcY ^cheZXi ^i# >[ ndj Y^hXdkZgi]ZbVX]^cZ^hYVbV\ZY!please imme- diately call Customer Service at (570) 546-9663 for advice.

HVkZi]ZXdciV^cZghVcYVaaeVX`^c\bViZg^Vah[dg edhh^WaZ ^cheZXi^dc Wn i]Z XVgg^Zg dg ^ih V\Zci# Otherwise, filing a freight claim can be difficult.

L]ZcndjVgZXdbeaZiZanhVi^h[^ZYl^i]i]ZXdcY^" i^dcd[ndjgh]^ebZci!^ckZcidgni]ZXdciZcih#

<%+-'&'8daY8jiHVl

Image 12 Contents
Model G0682 12 Cold CUT SAW Ss ,EAD from Leadbased PAINTS Table of Contents Introduction Manual Accuracy Functional OverviewContact Info Identification Machine Data Sheet Main Specifications Operation Information +-&8daY8jiHVl  !,7!93 53%3 %!2.2 02/4%#4/ %. /0%2!4.! -!#.%29 BVXcZgn cdhZ XVc XVjhZ eZgbVcZci ZVgc\adhh# 53%3!!2/5.$%$ %84%.3/..#/2$ 2!4%$4&/2/4%-!#.%!-0%2!%2  !,7!93 ,/#+ -/,% !3%33 & 53%$ % %&/2% /0%2!4. -!#.%29#Safety Instructions for Metal Cutting Saws Hearing Protection & Hazards220V 3-Phase Operation Circuit RequirementsSetup Items Needed for SetupUnpacking Description QtyInventory Container 1 Figure QtyContainer 2 Figure HardwareNot ShownClean Up Placement LocationSite Considerations Floor LoadMounting Workbench MountingBolting to Concrete Floors Assembly To mount the stand to the floorTo assemble the machine HYZEVcZaLVhZgh # HVl7VhZ =Zm7dai HiVcY ?VbCji =VcYaZ ZVgWdm=ZVYHliXEaj\ HdX`Zi AdX`8daaVg BVXcZ7VhZ HjeedgiGdaaZg =Zm7daihTest Run HZiHXgZl Ldg`HideGdY KhZ7VhZTo test run the machine  IjgciZbVXcZOFF# +-&8daY8jiHVlON/OFF Switch Ijgch Power Indicator Light adlh \gZZc lZcOperations Basic ControlsCutting Angle Saw Handler AdlZgh iZTo set the cutting angle Adjustable Vise Jaw To adjust the vise jawVise AngledcPage 18#To adjust the auxiliary stability bracket Auxiliary Stability BracketVise Quick Release Lever To use the quick release leverWork Stop GZaZVhZY 8aVbeZYJhZ iZ ldg` hide id eZgdgb XdchhiZci aZc\i Xjih# To use the work stopDraining/Cleaning Cutting Fluid Reservoir Cutting FluidFilling Cutting Fluid Reservoir 8VeHXgZlh 8jiic\ajYGZhZgkdgBlade Terminology Blade PitchBlade Terminology EZgcXIEBlade Feed Rate To select the correct blade pitch BZVhjgZiZiX`cZhhdndjgldg`eZXZ# Blade Break-in Blade Changes To replace the blade\jVgY # Ac`V\Z43# Chip Inspection Chart Cutting Procedures Cutting TipsGeneral Machine Tips To make a cutAccessories Maintenance CleaningSchedule Unpainted Cast IronGearbox Oil Tools Needed QtyTo change the gearbox oil Service TroubleshootingMotor & Electrical Hnbeidb EdhhWaZ8VjhZ 8dggZXikZ6XidcOperations CVYZfjViZWaVYZajWgXVidc#Blade Troubleshooting 25#Wiring Wiring Safety InstructionsWiring Diagram HZZ FigureElectrical Components %+-ZaZXigXVaXdbedcZcih# +-&8daY8jiHVlParts Parts BreakdownParts List DescriptionControl Box Breakdown IG6CHDGBGStand Breakdown Blade Danger Warning =dlYYndjaZVgcVWdjijh4 TTTT 6YkZgihZbZci  Tttt gZcY TTTT 8VgY9ZX`  Tttt LZWhiZ TTTT DiZg8VWcZiBV`Zg IdYVn»h=dbZdlcZgEaVXZ HiVbe =ZgZ $5342!, .# 0/ /8  %,,.!- 7! 22!.49 !.$ 2%452.3 #ALL 4ODAYD&ORO! &2%%