Woodstock M1105, M1106, M1104 owner manual Box Bellingham, Wa

Page 26

FOLD ALONG DOTTED LINE

Place

Stamp

Here

WOODSTOCK INTERNATIONAL INC.

P.O. BOX 2309

BELLINGHAM, WA 98227-2309

FOLD ALONG DOTTED LINE

TAPE ALONG EDGES--PLEASE DO NOT STAPLE

Image 26
Contents HEAVY-DUTY Bench Grinders Page Contents Woodstock Technical Support SpecificationsIntroduction Safety Standard Safety InstructionsKeep Proper Footing and Balance at all times Additional Safety Instructions for Grinders Extension Cords Electrical110V Operation GroundingInventory SET UPUnpacking Box Inventory QtyTo mount the Heavy-Duty Bench Grinder, do these steps Shop PreparationMounting Grinding Wheel Installation Tool Rest and Eye ShieldTest Run To perform a test run, do these stepsGrinding Operations OperationsGeneral Wheel Selection Changing Grinding Wheels To change a grinding wheel, do these stepsMaintenance Lubrication & CleaningTroubleshooting Problem Possible Cause Corrective ActionM1104 Wiring M1104 Electrical SystemM1105 Wiring M1105 Electrical SystemM1106 Wiring M1106 Electrical SystemM1104, M1105, M1106 Parts Diagram Parts PART# Description Warranty Warranty Registration CommentsBOX BELLINGHAM, WA