Cooper Lighting IMI-6950 dimensions Sheet 2, Quick Mount Plate, Center Access Hole, Latch Retainer

Page 2

INSTALLATION INSTRUCTIONS

IMPORTANT : READ CAREFULLY BEFORE INSTALLING FIXTURE. RETAIN FOR FUTURE REFERENCE

EPL Envoy

Task Light Field Installation Kit

Sheet 2 of 3

4/7/08IMI-695D

LUMINAIRE RE-INSTALLATION:

1.Note: Install lens to housing if removed during drilling. Reverse Step 3.

2.Secure hanging hook into the rear hooks of quick mount plate (Figure 3 & 4).

3.Make wiring connection while luminaire is being suspended from hanging hook.

4.Push excess wires and connectors up into the junction box.

5.Lift up luminaire onto the (4) four hooks of quick mount plate while guiding the wires through center access hole (Figure 3).

6.Push luminaire forward for engagement. When it reaches the full-engaged position, a “CLICK” can be heard.

CAUTION: If full engagement is not reached, it is not yet rigidly installed.

Figure 4

QUICK MOUNT

PLATE

REAR HOOKS

FRONT HOOKS

 

LUMINAIRE

CENTER ACCESS HOLE

HANGING HOOK

 

Figure 5

LATCH

RETAINER

#8-32

SCREW

Figure 6

UPPER

REFLECTOR

THUMB

SCREW

These instructions do not claim to cover all details or variations in the equipment, procedure, or process described, nor to provide directions for meeting every possible contingency during installation, operation or maintenance. When additional information is desired to satisfy a problem not covered sufficiently for user’s purpose, please contact your nearest representative.

NOTE: Specifications and dimensions subject to change without notice.

Customer First Center 1121 Highway 74 South Peachtree City, GA 30269 770.486.4800 FAX 770.486.4801 ADH080775

Image 2
Contents Handle Sheet 1TAMPER-PROOF Screw for Latch Screw for Handle Quick Mount Plate Hanging Hook LuminaireQuick Mount Plate Center Access HoleSheet 2 Latch RetainerSheet 3