Grizzly G0597, G0598, G0599 owner manual Circuit Requirements, Operation

Page 9

SECTION 2: CIRCUIT REQUIREMENTS

Operation

Serious personal injury could occur if you connect the machine to the power source before you have completed the set up pro- cess. DO NOT connect the machine to the power source until instructed to do so.

Amperage Draw

The motor for your machine may draw the follow- ing amps at maximum load.

G0596 at 110V Single-Phase

............... 14

Amps

G0597 at 220V Single-Phase

.............. 8.5

Amps

G0598 at 220V

Single-Phase

............... 12

Amps

G0599 at 220V

3-Phase

10

Amps

Circuit Requirements

We recommend connecting this machine to a dedicated circuit with a verified ground, using the circuit breaker size given below. Never replace a circuit breaker with one of higher amperage with- out consulting a qualified electrician to ensure compliance with wiring codes. If you are unsure about the wiring codes in your area or you plan to connect your machine to a shared cir- cuit, you may create a fire hazard—consult a qualified electrician to reduce this risk.

G0596 at 110V

15

Amp Circuit Breaker

G0597 at 220V

15

Amp Circuit Breaker

G0598 at 220V

15

Amp Circuit Breaker

G0599 at 220V 3-Phase.15

Amp Circuit Breaker

Plug Type

With the exception of the G0596, the cord set enclosed does not have a plug as the style of plug you require will depend upon the type of service you currently have or plan to install. We recom- mend using the following plugs for your machine on a dedicated circuit only (see Figures 1–3for examples):

G0597 at 220V

NEMA 6-15 Plug

G0598 at 220V

NEMA 6-15 Plug

G0599 at 220V 3-Phase..

NEMA 15-15R Plug or

..220V Locking Shut-Off Switch (recommended)

Figure 1. NEMA 6-15 plug and receptacle.

��������

����������

�������

��������

������

�������������

Figure 2. NEMA 15-15R plug and receptacle.

G0596-G0599 Industrial Bench Grinders

-7-

Image 9
Contents Model Page Table of Contents Introduction ForewordContact Info G0596 G0597 G0598 G0599 IdentificationSafety Instructions for Machinery SafetyAlways Lock Mobile Bases if Used Before Operating Machinery Additional Safety Instructions for Grinders Operation Circuit RequirementsPhase Converter GroundingExtension Cords Set Up Safety SET UPItems Needed for Set Up UnpackingInventoryMounting When locating your grinder, rememberEye Shields Box QtyDust Collection Test Run To connect a dust collection hoseTo test run the grinder Hardware Recognition Chart Operation Safety Grinding Tips OperationsHere are some tips to keep in mind while grinding Wheel Care Wheel Selection Here are some tips to help you avoid breaking the wheelBasic format for wheel numbering is Wheel Inspection Wheel DressingTo perform a Ring Test To replace a grinding wheel Wheel ReplacementG0598 Replacement Wheels AccessoriesTroubleshooting Service110V Wiring Diagram G0596 Single Phase 220V Wiring Diagram G0597/G0598 Single Phase 220V Wiring Diagram G0599 Phase Main Parts Breakdown Shield Description Parts List G0596-G0597Wheel Cover Parts List G0598-G0599Warranty and Returns Page Page