Maintenance
Maintenance and Operation
Inspection intervals depend on fan operating conditions and may vary from a minimum of 2 weeks to a maximum of 6 months.
The following components should be specifically inspected when inspecting the overall fan conditions:
-Screw torque.
-Fasteners corrosion.
-General condition of blade surface.
The vibration level must not exceed the most restrictive amplitude values between the limits imposed by the normative of the structure where the fan is installed and the limits imposed by the VDI 2056 normative. In this case, shut down the unit and trace the cause of such excessive vibration by referring to page 14.
It is advisable to keep a record of the readings taken on each oc- casion for comparison. Always take readings at the same positions and in the same manner. Observe the safety precautions insuring power supply is turned off. The fan vibration levels constitute an invaluable indication of the state of the plant and should be moni- tored frequently (e.g. monthly).
Temperature Range
This series of fans are designed to operate at these temperatures. Minimum is
Maximum is +82ºC (+180ºF)