York YUHC 18-60, YUHC 07-18 Wiring Diagrams, Electrical work, Circuit Wiring, Power source

Page 17

WIRING DIAGRAMS

Wiring

Prepare the power source for exclusive with the air conditioner.

The supply voltage must comply with the rated voltage of the air conditioner. The plug socket shall be accessible after installation.

Remark: All the wiring must be based on the wiring nameplate which is shown on the model.

CAUTIONS

Perform the wiring with sufficient capacity. Installation places legally require a short circuit isolator to be attached to prevent electrical shock.

Do not extend the power cable code by cutting.

Power voltage should be in the range of 90%-110% of rated voltage.

The plug of the air conditioner takes a grounding leg, and clients should use a grounding socket so that the air conditioner can be grounded efficiently.

If the power cord is damaged, replacement should be conducted by qualified technician or a serviceman.

NOTE Remark per EMC Directive 89/336/EEC

To prevent flicker impressions during the start of the compressor (technical process), following installation conditions do apply.

1.The power connection for the air conditioner has to be done at the main power distribution.

The distribution has to be of a low impedance, normally the required impedance reaches at a 32 A fusing point.

2.No other equipment has to be connected with this power line.

3.For detailed installation acceptance, please refer to your contract with the power supplier if restrictions do apply for products like washing machines, air conditioner or electrical ovens.

4.For power details of the air conditioner, refer to the rating plate of the product.

5.For any question, contact your local dealer.

CAUTIONS

Never modify the unit by removing any of the safety guards or by bypassing any of the safety interlock swithces.

Connect the connecting cable correctly and connect the connecting cable to terminal as identified with their respective marks.

Do not scratch the conductive core & inner insulator of power supply cables and do not deform or smash on the surface of cables.

Model 18

Power supply

220-240V/1Ph/50Hz

L

N

1

2(N)

3

4

T3

E

 

 

 

 

Indoor Unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

1

N

3

4

T3

E

 

 

 

 

Outdoor Unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Model 24

Power supply

220-240V/1Ph/50Hz

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Indoor Unit

L

N

1

2

3

T3

E

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L

N

1

N

3

T3

E

 

 

 

Outdoor Unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Electrical work

 

 

Circuit

Wiring

Model

Power source

breaker/

size

 

 

fuse

 

 

 

18000 Btu/h

220-240V - 50Hz

30/25A

3 x 1.5 mm2

24000 Btu/h

220-240V - 50Hz

40/25A

3 x 2.5 mm2

30000 Btu/h

380V 3N - 50Hz

20/15A

5 x 1.5 mm2

36000-60000 Btu/h

380V 3N - 50Hz

25/15A

5 x 2.5 mm2

NOTE

The supply voltage must be consistent with the rate voltage of the air conditioner.

Model 30-60

Power supply 380V/3Ph/50Hz

 

 

 

 

 

 

 

 

 

 

 

 

A

B

C

N

1

2

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

B

C

N

1

2

3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Indoor Unit

Outdoor Unit

ENGLISH 17

J368-EN.indd 17

2/1/07 9:41:22 AM

Image 17
Contents Models Minisplit AIR BlowerContents Extended Parts Safety PrecautionsOutdoor Unit Indoor & Outdoor Unit Display Panel Part NamesTechnical Specifications Duct Type Yuhc R-410A -50Hz Technical SpecificationsTechnical Specification Ducted Dc Inverter Yuhc R-410A, 50Hz Yukc 07AA-AAR Yukc 09AA-AAR Yukc 12AA-AAR Yukc 18AA-AAR Outdoor Unit Multi Inverter Rrjc Operating TemperatureRrjc Outdoor Unit DimensionsYujc Indoor Unit Preparation Before InstallationInstallation Install the main body Yukc Outdoor Units Necessary Room for Installation and MaintenanceChart Cold Area Recommendation Moving and InstallingFixing and Piping Refrigerant Piping ConnectionsMaximum Piping Length Unit sizeModel FAN SpeedsWiring Wiring DiagramsCircuit Wiring Power sourceYukc Rrjc For 36,000-60,000 Btu/h Defrosting Operation Available for heating only Service and MaintenanceOperation Tips Problem Probable cause Remedy Trouble Shooting GuideDeclaration of Conformity Declaration of Conformity

YUHC 18-60, YUHC 07-18 specifications

York's YUHC (York University Hockey Club) has made a significant impact in the world of youth and community sports, with two notable teams: YUHC 07-18 and YUHC 18-60. Both squads have distinct characteristics, technologies, and features that contribute to their success and the development of young athletes.

The YUHC 07-18 team focuses on youth development, catering to players aged 7 to 18. This age group is crucial for skill acquisition, team dynamics, and personal growth. The coaching staff is trained in age-appropriate methodologies, promoting not only athletic excellence but also an environment where teamwork and sportsmanship thrive. The team utilizes innovative training technologies, such as video analysis software, which allows coaches to break down gameplay and provide personalized feedback to players. This technology enhances player performance, helping them to understand their strengths and areas for improvement.

In terms of equipment, YUHC 07-18 has access to state-of-the-art hockey gear, ensuring that players are both safe and competitive on the ice. Regular equipment checks and maintenance are conducted to ensure players have the best gear available, which helps in minimizing injuries and maximizing performance.

On the other hand, YUHC 18-60 serves older players, ranging from 18 to 60 years. This team emphasizes inclusivity and skill enhancement for both experienced players and those new to the sport. It combines recreational play with competitive elements, encouraging players to remain active while enjoying the benefits of team sports. The emphasis here is on community building and fostering lifelong friendships through hockey.

Both teams leverage technology to improve performance and engagement. Virtual training sessions and online workshops have become increasingly popular, especially during off-ice training periods. Players can connect with coaches and peers to enhance their skills from home, making the training schedule flexible and adaptable to personal commitments.

In summary, York's YUHC 07-18 and YUHC 18-60 represent a harmonious blend of youth development and community engagement. Through advanced training methods, top-tier equipment, and a focus on teamwork, these teams contribute positively to the landscape of local sports, creating an environment where players of all ages can thrive and build lasting relationships on and off the ice.