GE AST05 Preparing to install the air conditioner, Safety Instructions, Operating Instructions

Page 8

Safety Instructions

Preparing to install the air conditioner.

Read these instructions completely and carefully.

Before You Begin

Operating Instructions

NOTE TO INSTALLER: Leave these instructions with the air conditioner after installation is completed.

NOTE TO CONSUMER: Keep this Owner’s Manual and Installation Instructions for future use.

IMPORTANT NOTES:

For personal safety, this air conditioner must be properly grounded.

It is important to have the wall outlet and circuit checked by a qualified electrician if there is any doubt as to whether a proper ground exists.

Follow National Electric Codes (NEC) and/or local codes and ordinances.

CAUTION:

Do not, under any circumstances, cut or remove the third (ground) prong from the power cord.

Do not change the plug on the power cord of this air conditioner.

Aluminum house wiring may present special problems—consult a qualified electrician.

Electrical Requirements

Some models require 115/120-volt a.c., 60 Hz grounded outlet protected with

a 15-amp time delay fuse or circuit breaker.

The 3-prong grounding plug minimizes the possibility of electric shock hazard. If the wall outlet you plan to use is only a 2-prong outlet, it is your responsibility to have it replaced with a properly grounded 3-prong wall outlet.

Some models require 230/208-volt a.c., protected with a time delay fuse or circuit breaker. These models should be installed on their own single branch circuit for best performance and to prevent overloading house or apartment wiring circuits, which could cause a possible fire hazard from overheating wires.

Consumer Support Troubleshooting Tips Installation Instructions

Tools You Will Need

Phillips-head screwdriver

Scissors or knife

Adjustable wrench

Pencil

Ruler or tape measure

Level

8

Image 8
Contents 49-7399-1 JR Write the model and serial numbers hereSafety Precautions Installation Instructions OperatingInstallation About the controls on the air conditionerInstructions Consumer SupportAir Direction Side-to-Side Air Direction Up and Down on some modelsCare and cleaning of the air conditioner Grille and CaseOutdoor Coils Air FilterSafety Instructions Troubleshooting Tips Consumer SupportFront Grille and Case To remove the front grillePreparing to install the air conditioner Safety InstructionsOperating Instructions Read these instructions completely and carefullyWindow Installation Instructions Parts IncludedStorm Window Requirements Operating Instructions SafetyWindow Requirements Safety Instructions Operating Prepare the Air ConditionerInstall the Air Conditioner in the Window Install the Security Bracket and the Foam Top Window GasketThrough the Wall Installation Instructions-Optional Finish the Wall OpeningBefore you call for service… Normal Operating SoundsTroubleshooting Tips Consumer Support Operating Instructions Safety Instructions We’ll Cover Any Appliance. Anywhere. Anytime Consumer Product Ownership Registration Air Conditioner Warranty What Is Not CoveredWe Will Replace For The PeriodSchedule Service Parts and AccessoriesConsumer Support GE Appliances Website Real Life Design Studio
Related manuals
Manual 36 pages 42.56 Kb Manual 20 pages 31.58 Kb

AST05, ASV05, AST06 specifications

The GE ASP05 and AST06 are advanced electronic systems that represent the cutting edge of technology in various applications, particularly in the fields of automation, control, and monitoring. These devices are part of General Electric’s commitment to providing efficient and reliable solutions for industrial operations.

The GE ASP05 is known for its robust architecture, designed to withstand harsh environments while delivering exceptional performance. It features a high-speed processor that enables faster data processing and response times, making it ideal for real-time applications. Its modular design allows for scalability, enabling businesses to customize their systems according to specific needs. The ASP05 supports multiple communication protocols, ensuring interoperability with various devices and systems, which is crucial for seamless integration in industrial setups.

On the other hand, the GE AST06 is a specialized model that focuses on advanced sensor technologies. It employs state-of-the-art sensing techniques that enhance the accuracy and reliability of data collection. The AST06 is equipped with advanced algorithms that facilitate predictive maintenance, reducing downtime and maintenance costs. Its user-friendly interface allows operators to easily access data and insights, promoting informed decision-making.

One of the standout features of both models is their built-in security measures. GE has prioritized cybersecurity in the design of the ASP05 and AST06, incorporating multiple layers of protection to safeguard critical data and operations from potential threats. This is particularly important in today's digital landscape, where industrial systems are increasingly vulnerable to cyberattacks.

Additionally, both models are designed with energy efficiency in mind. They are capable of optimizing energy consumption without compromising performance, aligning with global sustainability goals. This focus on energy efficiency not only reduces operational costs but also contributes to a lower environmental impact.

In conclusion, the GE ASP05 and AST06 are testament to GE's commitment to innovation and excellence in electronic systems. With their advanced features, robust design, and emphasis on security and efficiency, they are well-suited for a variety of industrial applications. These models exemplify the future of automation and control, driving productivity and performance in a rapidly evolving technological landscape. Businesses looking to enhance their operations will find that the GE ASP05 and AST06 offer substantial benefits that are difficult to overlook.