American Standard T038.900 installation instructions Testing, Service

Page 3

4 TESTING

Turn the HOT HANDLE clockwise and the COLD

HANDLE counterclockwise to the off position.

Unscrew and remove the STREAM STRAIGHTENER.

Slowly turn on the water supplies.

Operate the HANDLES to flush water lines thoroughly.

Check SPOUT connection for leakage.

Turn the Handles off. Replace the SPOUT END.

HOT

HANDLE

STREAM

STRAIGHTENER

COLD

HANDLE

5 SERVICE

To change the direction of handle rotation

Turn off the water supplies

Turn HANDLE (1) to the off position.

Unthread the HANDLE BASE (2) from HANDLE ADAPTER (3).

Unthread HANDLE ADAPTER (3) and remove.

Remove VALVE LOCKNUT (4). A 17mm deep socket is required.

Remove the CARTRIDGE (5) by pulling up on the SLEEVE (6).

1

2

3

Remove SCREW (7) and pull off SLEEVE (6).

90˚

4

Remove the SPRING CLIP (8).

9

7

 

Remove the STOP WASHER (9). Turn it 90˚ and replace.

Replace the SPRING CLIP (8).

Reverse the above steps to reassembly the components.

If the spout drips, operate the handles several times from

the off to the on position. Do not force - the handles only turn 90˚.

6

8

5

6 CARE INSTRUCTIONS

EverClean™ Finish Care Instructions

American Standard’s EverClean finish will wipe clean with a soft, dry cloth. A soft cloth with clean water may also be used, if desired. No additional cleaning products are required.

DO NOT USE: Soaps, acid, polish, abrasives, harsh cleaners, or a cloth with a coarse surface.

M968896

Image 3
Contents Front Spout InstallationDeck Mount TUB SystemsInstall Handles Install Handle AdaptersService TestingTUB Fillers Install Handle AdapterTest Installed Diverter Install Hand Shower