|
| Installation |
Williamsburg | T M | Instructions |
| 7391.229 | |
BIDET FITTING |
| 7391.224 |
|
|
Thank you for selecting
To ensure that your installation proceeds
Certified to comply with ASME A112.18.1M U.S. Patent No. 5,819,789
M 9 6 8 0 3 2 A
|
|
| 8 TO 12 | ||||
| TRANSFER VALVE (FOR FLUSHING |
|
|
|
| ||
|
| RIM OR SPRAY) |
|
|
|
| |
| BIDET OUTLINE |
|
|
| (C) | (H) | |
| IS SYMBOLIC | 7/8 DIA. |
|
| |||
CARE INSTRUCTIONS: |
|
|
|
|
|
| |
DOUCHE SPRAY | ADJ. |
|
|
| |||
DO: SIMPLY RINSE THE PRODUCT CLEAN | TO | DIA. |
|
|
| ||
|
|
|
| ||||
|
|
|
|
|
| ||
WITH CLEAR WATER. DRY WITH A SOFT |
|
|
|
|
| ||
COTTON FLANNEL CLOTH. |
|
|
|
|
| ||
DIA. |
|
|
|
|
| ||
DO NOT: CLEAN THE PRODUCT WITH SOAPS, |
|
|
|
|
| ||
ACID, POLISH, ABRASIVES, HARSH CLEANERS, |
| FINISHED | FINISHED |
|
| ||
|
|
|
| ||||
OR A CLOTH WITH A COARSE SURFACE. |
|
| FLOOR |
|
| ||
|
| WALL |
|
| |||
|
|
|
|
| |||
|
|
|
|
|
|
DIVERTER AND VACUUM BREAKER ASSEMBLY
FOR GROUND JOINT CONNECTION OR 1/2 " O.D. SLIP (INLETS)
REAR VIEW WITH
WALL REMOVED
1 BIDET FAUCET INSTALLATION
CAUTION | Turn off hot and cold water | |
supplies before beginning. | ||
|
Place MOUNTING NUTS (1) onto the VALVE BODIES
(2) and insert VALVE BODIES (2) through outside |
holes, from underside of the BIDET LEDGE. Drop the |
2 DRAIN INSTALLATION | STOPPER |
Assemble | 9 |
and NUT (4) to DRAIN BODY (5). Concave side | |
of cup WASHER (2) is toward ball. |
|
RUBBER RING (3) over the VALVE BODIES (2) and |
screw on the ESCUTCHEON (4) until it locks against |
the internal stop. |
Tighten the MOUNTING NUT (1) to secure the VALVE BODY (2).
Remove MOUNTING NUT (9) and UPPER GASKET (7) from TRANSFER VALVE (8) and insert into the center forward hole of BIDET.
Replace UPPER GASKET (7). Position the side threaded outlet rearward and secure MOUNTING NUT (9). Thread ESCUTCHEON (5) onto TRANSFER VALVE (8) until it seats against the BIDET LEDGE.
5
9
4
Thread LOCKNUT (6), WASHER (7) and GASKET (8) onto DRAIN BODY (5).
Apply a bead of PUTTY to underside of FLANGE (9).
Feed DRAIN BODY (5) up through BIDET and thread FLANGE (9) fully onto BODY (5).
Tighten LOCKNUT (6) firmly, keeping the PIVOT ROD (3) pointed towards the back of the BIDET.
Push DRAIN ESCUTCHEON (10) onto TAILPIECE (11).
| PUTTY |
8 | BIDET |
CLIP |
7 | 4 | |
2 | ||
| ||
6 | 3 | |
1 | ||
|
5
11
10
3
BIDET
LEDGE
2
HOTCOLD
17
8
3 | SPRAY INSTALLATION | 7 | 2 | 8 |
| PUTTY | 1 | ||
| Assemble SPRAY BODY (1) to BIDET. 6 | |||
| 7 |
| ||
| Using putty, seal underside of SPRAY |
|
| |
| BODY FLANGE (2) and secure with | 5 |
|
|
| NUT (3). |
| 3 | |
|
|
| ||
| Screw SPRAY HOSE (4) with SEAL |
|
| 5 |
| WASHER (5) to SPRAY BODY (1). |
|
| |
| Connect other end of HOSE (4) with |
|
|
|
SEAL WASHER (5) to side outlet | 4 | |
NIPPLE (6) of the TRANSFER VALVE (7). | ||
|
Screw SPRAY CAP (8) onto SPRAY BODY (1).