Step 1 - Attach Carpet Spikes or Floor Glides.
CAUTION: the ends of the Carpet Spikes are very sharp and may scratch
If the Floor Glides (D) are used, do not install the Carpet Spikes (E), simply thread the Floor Glides into the threaded holes in the Metal Base (B) instead of the Carpet Spikes as shown in Diagram 1A.
Thread a Spike Nut (F) onto each Carpet Spike (E); then, thread the Carpet Spikes into the Metal Base (B) as shown in Diagram 1B.
Stand the Metal Base (B) upright and screw the Carpet Spikes (E) in or out until the Metal Base is level; then, turn the Spike Nuts (F) until they are snug against the Metal Base to lock the Carpet Spikes in place. If the Floor Glides (D) are used, simply thread them in or out until the Metal Base (D) is level.
Diagram 1A | Diagram 1B |
BF
B
DE
Step 2 - Attach 3″ Cope Tubes to Metal Base
Place a Pan Head Bolt (I) through each of the four holes in the Metal Base (B); then, thread them into the four 3″ Cope Tubes (A).
Tighten the four Pan Head Bolts (I).
Diagram 2
A
A
B
A
A
I
I
I
I