Westinghouse W-011 owner manual Mise EN Garde, Advertencia

Page 11

FIGURE 2.

GROUP A:

CONNECT TO BLACK

CONNECT TO WHITE

HOUSE WIRE

GROUP B: HOUSE WIRE

BLACK

 

WHITE

WHITE OR GREY WITH TRACER

WHITE OR GREY WITHOUT TRACER

BROWN, GOLD OR BLACK

BROWN, GOLD OR BLACK WITH TRACER

WITHOUT TRACER

 

NOTE: When parallel wire (SPT I & SPT II) is used; the neutral wire is square shaped and ridged, and the hot wire will be round in shape and smooth. (See below.)

FIGURE 2.

À BRANCHER AU FIL NOIR

À BRANCHER AU FIL BLANC

GROUPE A: DE LA RÉSIDENCE

GROUPE B: DE LA RÉSIDENCE

NOIR

BLANC

BLANC OU GRIS AVEC TRACEUR

BLANC OU GRIS SANS TRACEUR

BRUN, DORÉ OU NOIR SANS TRACEUR

BRUN, DORÉ OU NOIR AVEC TRACEUR

NOTA: Dans le cas des fils parallèles (SPT I et SPT II), le fil neutre est carrè et Côtelè et le fil chargè est rond et lisse. (Voir ci-dessus)

FIGURA 2.

GRUPO A:

CONÉCTELO AL CABLE

CONÉCTELO AL CABLE

NEGRO DE LA CASA

GRUPO B: BLANCO DE LA CASA

NEGRO

 

BLANCO

BLANCO O GRIS CON MARCAS

BLANCO O GRIS SIN MARCAS

MARRÓN, DORADO O NEGRO SIN MARCAS

MARRÓN, DORADO O NEGRO CON MARCAS

NOTA: Cuando se usa cable en paralelo (SPT 1 y SPT 2), el cable neutro es cuadrado y acanalado, y el cable vivo es redondo y liso. (Ver abajo.)

WARNING

Turn off electricity to the mounting site before beginning installation.

Mounting instructions must be followed exactly as shown for the fixture to be safely supported.

MISE EN GARDE

Coupez le courant au site de montage avant de commencer l’installation.

Assurez-vous de suivre les instructions de montage exactement comme illustré afin que l’appareil d’éclairage soit installé de façon sécuritaire.

ADVERTENCIA:

Desconecte el suministro eléctrico al sitio de mon- taje antes de comenzar la instalación.

Se deben seguir las instrucciones de montaje exactamente como se indican para que el aparato tenga un soporte seguro.

11

Image 11
Contents Indoor Lighting Fixture Installation Instructions Electrical Shock can Result in Serious Injury Warranty InformationLine art shown may not exactly match the fixture enclosed Fixture Assembly Instructions Mounting and Wiring InstructionsGarantie Limitée DE Cinq ANS Page Instructions D’ASSEMBLAGE DE Lappareil Déclairage Instructions DE Montage ET DE RaccordementAdvertencia UNA Descarga Eléctrica Podría Causar Lesiones Garantía Limitada DE Cinco AñosFigura Instrucciones DE Montaje DEL Artefacto Instrucciones DE Montaje Y CableadoAdvertencia Mise EN GardeNettoyage ET Entretien Cleaning and CareCommande DE Pièces Ordering Parts
Related manuals
Manual 12 pages 49.93 Kb Manual 12 pages 49.98 Kb Manual 12 pages 49.99 Kb

W-011 specifications

The Westinghouse W-011 is a standout model in the realm of nuclear power generation, primarily known for its efficiency, safety, and innovative technologies. It represents a significant advancement in the Westinghouse series of pressurized water reactors (PWR), which are widely recognized for their robust design and high output.

One of the main features of the W-011 is its enhanced safety systems. As nuclear technology has evolved, so too have the safety protocols that govern reactor design. The Westinghouse W-011 integrates multiple redundant safety systems to ensure operational reliability. This includes advanced passive safety features that operate without requiring external power or operator intervention. In the event of an emergency, these systems can maintain core cooling and reactor integrity, significantly reducing the risk of accidents.

In terms of technology, the W-011 utilizes the latest in digital instrumentation and control systems. These systems improve the reactor's operational efficiency while allowing for real-time monitoring of performance metrics. The integration of advanced analytics enables operators to predict and manage potential issues before they escalate, leading to fewer downtime incidents and more consistent power output.

The W-011 is designed for a nominal output of 1,100 megawatts, making it a powerful contender in the energy market. Its compact footprint is an attractive quality for energy providers, as it enables the construction of facilities in diverse geographical locations. The reactor's modular design also allows for easier updates and maintenance, which can enhance its operational life cycle.

Furthermore, the advanced fuel technology used in the W-011 enhances its economic viability. The reactor utilizes low-enriched uranium fuel that is optimized for longevity and fuel efficiency, allowing it to operate for extended periods before requiring refueling. This fuel strategy not only reduces waste generation but also minimizes the interruptions in energy supply.

In summary, the Westinghouse W-011 combines cutting-edge safety features, advanced digital control systems, high output capacity, and innovative fuel technology to create a nuclear reactor that stands at the forefront of modern energy solutions. As global energy needs continue to evolve, the W-011 represents a potent balance of sustainability and reliability within the nuclear power sector.