Lightolier
45 INDUSTRIAL WAY, WILMINGTON, MA 01887
INSTALLATION INSTRUCTIONS FOR EYE-QLB LUMINAIRES
1 Preparation
•Rotate Side Reflectors to an open position.
•Remove Louver or Lens Assembly.
•Remove Side Reflectors by removing Tabs from Slots.
Louver | Side Reflector |
Assembly |
|
(Illustrated) |
|
End
Cover
Side
Reflector
Tabs/Slots
2 Continuous Row
•For continuous row mounting, remove End Cover.
Screw
End
Cover
Housing
End
Plate
3 Continuous Row Mounting
•With Fixture on its back, align Coupler holes with second and third holes in Housing.
•From inside Coupler and Outside Fixture, drive
(2) Screws into First Housing.
•Assemble Stem Sets or Cable Sets.
•For Continuous Row Mounting use Stem Sets or Cable Sets at the joints.
•Hang First Fixture and secure Second Fixture with Coupler and Screws.
•Make wiring connections, install T5/T8 lamps (by others).
|
|
|
|
| Fixtures shown in hanging position. |
|
| ||||
|
|
|
|
|
|
|
|
|
|
| Cable |
|
|
|
|
|
|
|
|
|
|
| Set |
|
|
|
|
|
|
|
|
|
|
| |
|
| Screw | Stem Set |
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Second |
|
|
| Screw |
|
| |
|
|
|
| Fixture |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Second Fixture | |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Screw |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
| Screw |
|
|
|
|
|
| First |
|
| |||
|
|
|
|
|
|
| |||||
Screw |
|
|
|
| |||||||
|
|
|
|
|
| Fixture | Screw |
|
| First | |
|
|
|
|
| |||||||
|
|
|
| Coupler |
|
|
|
|
|
| Fixture |
|
|
|
|
|
|
|
|
|
|
|
Coupler
|
|
|
|
|
|
|
|
| Screw |
Screw | ||||
|
|
|
|
|
© a Genlyte company 2005 | Printed in U.S.A. |