Lightolier Eye-QLB installation instructions Lightolier, Preparation, Continuous Row

Page 1

Lightolier

45 INDUSTRIAL WAY, WILMINGTON, MA 01887

INSTALLATION INSTRUCTIONS FOR EYE-QLB LUMINAIRES

1 Preparation

Rotate Side Reflectors to an open position.

Remove Louver or Lens Assembly.

Remove Side Reflectors by removing Tabs from Slots.

Louver

Side Reflector

Assembly

 

(Illustrated)

 

End

Cover

Side

Reflector

Tabs/Slots

2 Continuous Row

For continuous row mounting, remove End Cover.

Screw

End

Cover

Housing

End

Plate

3 Continuous Row Mounting

With Fixture on its back, align Coupler holes with second and third holes in Housing.

From inside Coupler and Outside Fixture, drive

(2) Screws into First Housing.

Assemble Stem Sets or Cable Sets.

For Continuous Row Mounting use Stem Sets or Cable Sets at the joints.

Hang First Fixture and secure Second Fixture with Coupler and Screws.

Make wiring connections, install T5/T8 lamps (by others).

 

 

 

 

 

Fixtures shown in hanging position.

 

 

 

 

 

 

 

 

 

 

 

 

 

Cable

 

 

 

 

 

 

 

 

 

 

 

Set

 

 

 

 

 

 

 

 

 

 

 

 

 

Screw

Stem Set

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Second

 

 

 

Screw

 

 

 

 

 

 

Fixture

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Second Fixture

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Screw

 

 

 

 

 

 

First

 

 

 

 

 

 

 

 

 

Screw

 

 

 

 

 

 

 

 

 

 

Fixture

Screw

 

 

First

 

 

 

 

 

 

 

 

 

Coupler

 

 

 

 

 

 

Fixture

 

 

 

 

 

 

 

 

 

 

 

Coupler

 

 

 

 

 

 

 

 

 

Screw

Screw

 

 

 

 

 

© a Genlyte company 2005

59-31147-000

Printed in U.S.A.

Image 1
Contents Lightolier Installation Instructions for EYE-QLB LuminairesPreparation Continuous RowFinal Assembly Prismatic DR Acrylic Lens Final Assembly Louver