Samsung AP55Q0DNUMG manual Test Operation

Page 30

Check and Test Operation (Continued)

Test Operation

After checking, read the manual carefully, and perform a test operation. Then deliver the unit to the customer.

(When delivering the unit, be sure to read carefully and follow the contents of the manual.)

1.Be sure to check whether the service valve is opened before attempting to perform the test operation.

2.Never attempt to start test operation by force pressing the electronic contactor as it is very dangerous.

(This is very dangerous as the protective device does not work.)

3.Be sure to perform the test operation after installation. It is easy to start the test operation in winter if you increase the sensor temperature to 23°C ~ 25°C by holding the indoor temperature sensor. (Cooling operation)

When the outdoor temperature is below zero, do not test operation for more than 3 minutes. Otherwise, the compressor will be damaged.

Temperature sensor

E-30

AP50Q0C_IBIM_E 32201-2.indd 30

2010-07-14 오후 4:40:57

Image 30
Contents Air Conditioner Safety Precautions Contents View of the Unit Indoor UnitRemote Control-Buttons Inserting the Remote Control BatteriesOperating Preparation ForCooling Your Room Selecting the Automatic Operating Mode Changing the Room Temperature Quickly ResultCooling Distant Place Removing Excess Humidity Airing Your Room Selecting E. Saver Mode When Adjusting the Air Flow Direction VerticallyAdjusting the Air Flow Direction Horizontally Cooling UpwardsTo Cancel the Off Timer Setting the Off TimerOther Function Operating RecommendationsTopic Recommendation Indoor Temperature Temperature and Humidity RangesCleaning Your Air Conditioner If the air conditioner is used at ThenSolving Common Problems Problem Explanation/SolutionTechnical Specifications Power SupplyCable tie Putty Pipe band Piping Accessory Parts ListPart Name Cover hole ScrewSelection of Installation Place Indoor UnitOutdoor Unit Electrical Work AP50Q0C/AP55Q2C/AP55Q2D Series When connecting 3Phase 4wires 380V ACWhen connecting 3Phase 3wires 220V AC AP55Q0C/AP55Q0D SeriesInstallation Procedures Pipe Bending Connection of Refrigerant PipingFlare Processing Tightening of Connection PartsConnecting the Pipe Drilling a Hole in the WallDrain Hose Air Purge Refrigerant Charging Check and Test Operation CheckTest Operation Packing and Unpacking Guide Outdoor unit How to connect your extended power cables Wire tube power cable Connection sleeveQuestions or COMMENTS?
Related manuals
Manual 34 pages 15.96 Kb