Charnwood Country 14B installation instructions PRE Lighting Check, Commissioning

Page 9

re-tighten the locking nut. Ensure that the flap opens and closes freely as the knob is turned.

PRE LIGHTING

CHECK

Before initial lighting the following points should be checked :-

1.The bottom grate bars must all be fitted and should move freely and easily when the riddling mechanism is operated.

2.The plates round the sides and back of the grate must be in position and sitting correctly.

3.The throat plate must be fitted in the roof of the appliance and should be checked to ensure that it has not become dislodged in transit. The method of location and positioning of the throat plate is shown in Fig. 3.

COMMISSIONING

On completion of the installation and after allowing a suitable period of time for the fire cement and mortar to dry out, the stove should be lit and checked to ensure that smoke and fumes are taken from the appliance up the chimney and emitted safely. Also check all joints and seals.

The central heating pump should be adjusted to give the correct water flow against the circuit resistance and the system should be correctly balanced.

On completion of the installation and commissioning please leave the operating instructions with the customer and advise on the use of the appliance and any controls on the system.

Flue connection may

 

 

 

 

 

 

 

 

 

 

 

 

Boiler tappings are 1" BSP Female

 

 

 

be Top or Rear

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

136

 

 

 

 

 

 

 

 

 

601

 

 

 

ø154

 

136

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

357

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

789

 

 

 

 

 

 

731

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

451

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

683

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

608

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

340

 

 

 

 

 

 

 

 

 

 

 

389

 

 

 

570

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

616

 

 

 

136

 

 

344

 

 

Country 14B Dimensions (All dimensions are in mm)

Page 8

Country 14B 09/03

Image 9
Contents Charnwood Country 14B Fuels Door OperationMultifuel Grate Lighting Controlling Fire Special Points When Burning CoalRiddling RefuellingCleaningand Maintenance Trouble ShootingChimney Sweeping Over-Firing Fire blazing out of controlFreezing Lack of Heat To Radiators / Hot WaterPerformance Health and Safety PrecautionsChimney Hearth and Fire SurroundSystem Controls Using 4 Boiler TappingsConnections to Flues Soot DoorsThermostat Commissioning PRE Lighting CheckDescription Charnwood Country 14B Parts List