connections
instaLLing tHe tOrOiDaL ferrite On tHe POWer caBLe
Lift up to release the lock and open the core.
Close the lock back. | Wind Power cable around the core three times. |
| (Start winding at |
EnG
●connEctions
11
Lift up to release the lock and open the core.
Close the lock back. | Wind Power cable around the core three times. |
| (Start winding at |
EnG
11