GE CC-SCRS01 installation instructions Introduction, Installation

Page 1

SmartCom Room Station

Installation Instructions

Introduction

This is the GE SmartCom Room Station Installation Instructions for model CC-SCRS01. This document describes how to mount and wire the room station.

1057308A • February 2007

Copyright © 2007, GE Security Inc.

3.Connect the cable as appropriate (see Wiring).

4.Line up the top of the face plate with the top of the base and press the tab on the base while you fit the face plate to the base. Release the tab to secure the face plate to the base.

SmartCom provides a modular, expandable system for the distri- bution of music and intercom functions throughout the home.

The SmartCom room station (Figure 1) provides a single, conve- nient graphical LCD keypad to control the SmartCom audio and intercom systems.

Figure 1. SmartCom room station

Wiring

You can use up to 200 ft. (61 m) of cable between the room station and the SmartCom intercom hub.

To connect the room station to the intercom hub, do the following:

1.

Run cable from the room station to the inputs on the front of

 

the intercom hub.

2.

Label both ends of the wire with the room station number.

3.

Plug one end of the cable into the back of the room station

Music controls

Music

Menu Music mute

On/off

..................

...................................................................................................

CD PLAYER

Return to system alarm

ON

OOOOO

All Doors

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

............................................. Intercom

.................. controls

.............. Intercom

............. DND

......... Listen/Mon

.................. Door

and the other end into any room station jack on the front of

the intercom hub (Figure 2).

Refer to your intercom hub documentation for more details.

Figure 2. Room station wiring diagram

CAT5 or CAT5e

Selection knob

Prewire requirements

Prewired and preinstalled CAT5 cable and low-voltage double- gang deep box or mud ring.

Note: You may need a second cable if the homeowner wants to upgrade the keypad to the GE SmartCom touch-screen model in the future.

Required equipment

Room stations 1 to 8

.........

 

 

 

 

 

 

 

 

 

 

.........

 

 

CD PLAYER

 

. . . . .

 

 

 

.............

 

 

Return to system alarm

 

.........

 

 

 

 

 

.........

 

ON

OOOOO

All Doors

 

.........

 

 

 

 

 

 

 

 

 

 

.........

 

 

 

 

 

.........

 

 

 

 

 

.........

 

 

 

 

 

.........

 

 

 

 

 

.........

 

 

 

 

 

.........

 

 

 

 

 

.....................................................................................................................

Intercom hub

You will need the following equipment to install the room station:

EZ RJ45 ratchet-style crimper

Phillips screwdriver

Installation

Terminate the CAT5 cables used to connect the room station with an RJ45 plug using the TIA 568A residential standard configura- tion. Proper installation of the CAT5e plug is critical to maintain 5e rating of the cable (see Cable preparation on page 1).

Mounting the room station

To mount the room station, do the following:

1.Press the tab on the bottom of the base and lift the face plate off the base.

2.Mount the back plate to a double-gang, low-energy box using the mounting screws provided. Do not overtighten the screws.

CAUTION: You must use the flathead screws provided or damage to the room station will occur.

Cable preparation

To add an RJ45 connector to the cable, do the following:

1.Use a CAT5e stripper to score the outer jacket about 2 in. (51 mm) from the end of the cable.

Note: Do not cut the cable with the stripper.

2.Use your fingers to bend the outer jacket back and forth until the jacket breaks off.

3.Cut the spline so that it does not protrude from the outer jacket. Be careful not to nick the wires.

4.Untwist the wires and flatten them until all kinks are removed.

5.Slide 0.25 in. (6 mm) of the outer jacket over the spline.

6.Trim the wires to 1.5 in. (38 mm) from the outer jacket.

7.Arrange the wires in the correct color code sequence according to the T568A pin out configuration.

8.Slide the wires into the RJ45 plug, keeping them in the correct color sequence. The tips of the wires will protrude from the end of the connector.

9.Continue sliding the wires all the way into the plug until about 0.25 in. (6 mm) of the outer jacket is inside the plug. The cable should stop sliding in when the spline touches the connector.

10.Crimp the connector using the EZ RJ45 ratchet-style crimper. The crimper will crimp then cut the wires. Use your fingers to finish breaking off the wires.

Image 1
Contents Introduction InstallationInstaller programming Cable testingSpecifications FCC compliance

CC-SCRS01 specifications

The GE CC-SCRS01 represents a significant advancement in control systems technology used in various industrial applications. This compact yet powerful system is designed to enhance efficiency and reliability in processes requiring precise control and monitoring.

One of the main features of the GE CC-SCRS01 is its robust architecture, which allows for integration with a wide range of platforms, ensuring seamless operation across different environments. Its modular design enables users to customize the system according to their specific requirements, facilitating easy upgrades and adaptations as technologies evolve.

The CC-SCRS01 employs state-of-the-art communication technologies, making it compatible with various industrial protocols. This flexibility supports both legacy and modern devices, ensuring operational continuity while allowing for future growth. The system incorporates advanced diagnostics and monitoring capabilities, which provide real-time insights into operational status and performance metrics. This feature helps operators identify issues promptly and make informed decisions to maintain peak efficiency.

In terms of technology, the GE CC-SCRS01 utilizes sophisticated algorithms to optimize control parameters, enhancing process stability and response time. The innovative use of AI and machine learning enables the system to adapt to changing conditions and improve performance over time. Furthermore, its user-friendly interface simplifies the interaction for operators, allowing for quick adjustments and real-time monitoring without extensive training.

Another significant characteristic of the CC-SCRS01 is its built-in redundancy features, which increase reliability and uptime in critical applications. With dual communication paths and backup power options, the system ensures that operations can continue uninterrupted, even in the event of a failure.

Moreover, the GE CC-SCRS01 is designed with a focus on energy efficiency. Its smart control algorithms help minimize energy consumption while maximizing output, aligning with today’s sustainability goals.

In summary, the GE CC-SCRS01 is a versatile and powerful control system offering advanced features such as modular design, compatibility with multiple protocols, real-time diagnostics, and energy efficiency. These capabilities make it an ideal choice for industries looking to enhance operational efficiency and reliability in an ever-evolving technological landscape.