Langley/Empire DV-55SPP installation instructions Installation Instructions

Page 11

INSTALLATION INSTRUCTIONS (continued)

4.Apply furnace cement to 4" diameter flue outlet collar on combustion chamber and to 4" diameter collar on vent cap. Attach 4" diameter flue outlet tube onto flue outlet collar on combustion chamber. Attach vent cap into the 4" diameter flue outlet tube. Attach vent cap to outside mounting plate with (3) #10 x 1/2" screws provided.

5.Reassembly and resealing vent-air intake system is completed.

Installing a Vent Near a Window Ledge,

Other Type of Projection or on Siding (vinyl, aluminum, etc.) Direct vent furnaces are designed to be installed on a uniform outside wall. When the wind comes from any angle (up, down or from either side), it must hit the vent cap equally over both the air inlet and the flue outlet portions of the vent. Any wall projection, such as a door or window casing, which disturbs the wind on one side of the air inlet section will result in back pressure on the flue section smothering the flame and eventual pilot outage.

When the vent cap is to be installed on siding or it appears that a projection within 6" of any side of the air inlet section could shield the air inlet section, the entire vent should be supported away from the wall at least the distance of the projection. 2" x 4" framing whose outside dimensions match the overall dimensions of the mounting plate is recommended. The 2" x 4" framing protects sid- ing from possible warpage or discoloration. All joints can then be sealed and painted. The wall depth plus the additional depth of the 2" x 4" framing should not exceed a total depth of 13" for DV-55. (See Figure 9)

Vinyl siding vent kit, DV-822, is available from Empire Comfort Systems, Inc. The depth is 3", which enables the vent cap to be extended away from siding or projections. The wall depth plus the additional 3" depth of the vinyl siding vent cap extension should not exceed a total depth of 13" for DV-55. (See Figure10)

Warning: When vinyl siding vent kit, DV-822 or 2" x 4" framing is added to an existing installation (furnace is installed) do not attempt to add sections of pipe to the flue outlet tube or air inlet tube. An air tight seal is required for both tubes. Refer to Parts List, page 16 to order tubes.

Figure 9

Figure 10

12431-7-0107

Page 11

Image 11
Contents Installation Instructions Table of Contents This is a Heating Appliance Important Safety InformationLP-GAS Warning Odor Safety Information for Users of LP-GASClear of ALL Obstructions Requirements for MassachusettsIntroduction SpecificationsRecommended Gas Pipe Diameter Installing a New Main Gas CockGAS Supply Locating Gas SupplyClearances ClearancesChecking Manifold Pressure Is located on the outlet side of the gas controlLocating Wall Opening Installation InstructionsInstalling Optional Side Outlets Locating Electric Supply Installation of Three-prong Grounding Plug AssemblyInstalling Vent Assembly Reassembly And Resealing Vent-Air Intake SystemInstallation Instructions Lighting Instructions For Your Safety Read Before LightingMain Burner Flame Characteristics Pilot Flame CharacteristicsThermostat Installation WiringWiring Service & Maintenance Suggestions Part number and description of part coincide HOW to Order Repair PartsParts List Parts View Service Notes Service Notes