Home And Office Set-Up
Base Station Operation
(From 120V AC House Current)
To operate your transceiver from home or office you will need a 13.8 volt DC Power Pack rated at a minimum of 2 amps, and a properly installed base station antenna.
Base Station
Operation
(From 120V AC
House Current)
+—
1Simply connect the red (+) and black
Warning!
Do not attempt to operate this transceiver by connecting it directly to 120 vac.
Note
For further information call Cobra Customer Service 1.773.889.3087.
23