Desa (V)VC36PE Series installation manual Horizontal System Installation Using TWO 90 Elbows

Page 14
5' min. 6' min. 7' min. 8' min. 20' max.
Vertical (V)

Venting Installation instructions

Continued

HORIZONTAL SYSTEM INSTALLATION

USING TWO 90° ELBOWS

The following configurations show the minimum vertical rise requirements for a horizontal system using two 90° elbows.

45° Elbow

Venting with Two 90° Elbows

 

 

Horizontal (H1) +

Vertical (V)

Horizontal (H1)

Horizontal (H2)

5' min.

2' max.

6' max.

6' min.

4' max.

12' max.

7' min.

6' max.

18' max.

8' min.

8' max.

20' max.

20' max.

8' max.

20' max.

Figure 17 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

Venting with Two 90° Elbows

Horizontal (H1) +

Horizontal (H2)

6' max.

12' max.

18' max.

20' max.45° Elbow 20' max.

Figure 18 - Horizontal Termination Configuration for Venting Using Two 90° Elbows

with Termination at 90° with Fireplace

14

www.desatech.com

116235-01F

Image 14
Contents What to do if YOU Smell GAS Table of Contents Safety Information Product Identification High traffic areasLocal Codes Product FeaturesPre-Installation Preparation Location and space requirementsFront 36 914 mm Top of Standoffs Vent See venting Clearances42 1067 mm Venting clearancesFireplace Framing and finishingNoncombustible mantels at any height above Location of Termination Cap Termination CAP AIR Supply Inlet GAS MeterVenting Installation Instructions Installation PrecautionsInstallation Planning Installing Horizontal Vent Cap Noncombustible Exterior Square Termination Round TerminationCorner Installation Recommended Applications Corner ground floor installationHorizontal System Installation Using TWO 90 Elbows Connect a section of pipe and extend up through the hole Installation for vertical terminationFlat Ceiling Installation Twist-lock the vent cap onto the last section of vent pipe High Altitude Installation Vertical VentingParts list for venting kits and components Desa 5/8 Pipe & Vent Kits Number DescriptionModel BK Installation Fireplace InstallationInstalling optional blower accessories Plug in blower power cordModel BKT Installation Blower Model BKTInstallation Items Needed Installing Gas Piping to Fireplace LocationBlower Wiring Diagram Connecting Fireplace to GAS Supply Propane/LP Supply TankExternal Regulator Vent Pointing DownClose equipment shutoff valve see Figure Checking GAS ConnectionsTest Pressures Equal To or Less Than Psig 3.5 kPa Disconnect fireplace and its individual equipRemoving Louver Panels Pressure Testing Fireplace Gas ConnectionsRemoving/Replacing Glass Door Removing Glass DoorCleaning Glass Door Installing lava rock and glowing embersInstalling Brick liner Models BL36DASA and BL36DHASA Close top and bottom louvers Wall Switch InstallationOptional Remote control Installation model WRC Wiring Diagram Lighting Instructions For your safety Read before lightingOperating Fireplace To Turn OFF GAS To ApplianceInspecting Burners Operating optional blower accessoryPilot Assembly Optional Remote OperationPilot and burners Cleaning MaintenanceGlass Door LogsVenting system TroubleshootingObserved Problem Possible Cause Remedy No gas to burner, although wall Wall switch wires defective Check wiring connectionUle And/or check ground wire to Pilot will not stay litGas leak. See Warning Statement at topTechnical Service Replacement PartsService Hints SpecificationsAccessories Illustrated Parts Breakdown Models VC36NE, VVC36NE, VC36PE and VVC36PEParts List 2827 19 18 Burner Pan Assembly Limited Warranty DIRECT-VENT Fireplace Warranty InformationKeep this Warranty