Desa C42EC2 To Install Elbows, C12S-8DM, Also for Straight RUN Over 30 FT. Level

Page 7

INSTRUCTIONS WHEN OFFSET OF CHIMNEY IS

 

 

 

OFFSETS AND RISE

 

 

 

 

NEEDED

 

 

 

 

 

 

 

A

B

48

36

18

12

A

B

48

36

18

12

12S

 

 

To Install Elbows

 

 

 

 

 

 

 

 

 

 

 

 

 

4 3/8

16 3/8

 

 

 

 

41 1/4

80 1/4

 

1

1

1

1

1. To achieve desired offset, you may install combinations of 12",

 

 

 

 

 

 

 

 

 

 

 

 

 

9 3/4

25 1/2

 

 

 

1

45

86 3/4

 

2

 

 

1

18", 36", and 48" lengths of double wall pipe (see Offsets and

 

 

 

 

 

 

 

 

 

 

 

 

 

12 3/4 30 3/4

 

 

1

 

46 3/4 89 1/2

1

 

1

1

1

Rise chart and Figures 18 and 20).

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

2. Chimney weight above offset rests on return elbow. Straps must

15

34 3/4

 

 

 

2

51

97

1

1

 

 

1

be securely nailed to rafters or joists (see Figure 19, Details A

18

40

 

 

1

1

53 1/4

101

 

2

1

 

1

and B).

 

 

 

 

 

 

 

 

 

 

 

 

 

21 1/4

46 1/4

 

1

 

 

56 1/4 106 1/4

2

 

 

 

1

3. Maximum length of pipe between supports (return elbow or

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

23 3/4

49 1/4

 

 

1

2

59 1/4 111 1/2

1

1

1

 

1

C12S-8DM) is 6’ of angled run. Maximum of two (2) 6’ angled

 

 

 

run sections per chimney system (see Figure 20).

27 3/4

56 3/4

1

 

 

 

61 3/4 115 1/2

2

 

 

1

1

NOTE: ANY OFFSET GREATER THAN 6 FEET MUST USE A

 

 

 

 

 

 

 

 

 

 

 

 

30

60 3/4

 

1

1

 

64 3/4 120 3/4

2

 

1

 

1

C12S-8DM, ALSO FOR STRAIGHT RUN OVER 30 FT. LEVEL.

 

 

 

 

 

 

 

 

 

 

 

 

 

33

66

1

 

 

1

68 1/4

127

1

2

 

 

1

 

 

 

 

 

 

 

 

36

71

1

 

1

 

70

130

2

 

1

1

1

 

 

38 1/4

75

2

74 1/4 137 1/2

1

2

1

1

 

 

 

 

 

76 3/4141 1/2

1

2

1

1

 

 

 

 

 

79 3/4146 3/4

 

4

 

1

 

B

 

CEILING

 

 

 

 

 

 

 

 

SUPPORT

 

 

 

 

 

 

 

 

 

PIPE

 

2"

 

 

SEE

 

 

 

 

C12S-8DM

 

 

 

 

 

 

 

 

MINIMUM

 

 

 

 

 

 

 

 

 

 

DETAIL A

 

 

 

 

 

 

 

 

 

 

 

 

 

ANGLE

 

 

 

 

 

 

 

 

 

FIRESTOP

 

 

 

 

 

 

 

 

 

 

 

 

SEE

 

A

 

 

DETAIL B

 

 

DETAIL B

 

 

 

 

 

 

 

 

 

 

All joints between offset shall be secured with two screws

 

 

 

 

 

 

 

 

only on the outer pipe and shall not penetrate the inner

 

 

 

 

 

 

 

 

stainless. See illustration above.

 

 

 

 

 

 

 

 

 

Figure 18

 

 

 

RETURN

 

 

 

 

 

 

 

 

ELBOW

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

DETAIL A

 

 

 

 

 

 

 

 

Figure 19

 

 

 

 

 

 

 

RETURN

 

RETURN

 

 

 

 

 

 

 

ELBOW

 

ELBOW

 

 

 

 

 

 

 

 

 

 

 

CEILING

 

 

RETURN

 

6' MAX

 

6' MAX

 

 

SUPPORT

 

 

 

OFFSET

 

 

 

 

ELBOW

 

 

 

PIPE

 

 

 

OFFSET

 

 

 

 

 

 

 

 

 

 

 

 

 

ELBOW

ELBOW

 

 

 

C12S-8DM

 

 

 

 

 

 

 

 

 

 

6' MAX

 

 

RETURN

 

 

RETURN

 

 

 

ELBOW

 

ELBOW

6' MAX

 

 

 

 

 

 

 

 

 

 

 

6' MAX

OFFSET

6' MAX

 

OFFSET

OFFSET

 

 

ELBOW

 

 

ELBOW

 

 

ELBOW

 

 

 

 

 

 

 

 

 

A

B

 

C

Figure 20

55951

7

Image 7
Contents Save this Book Installation InstructionsGeneral Installing the FireboxIntroduction Minimum Clearances to CombustiblesSupport Sections Assembling and Installing Your DOUBLE-WALL Chimney SystemBlower Assembly CBK3 Firestop Spacers Foot Rule Fireplace Enclosure Cold Climate Installations For Round TOP Termination on Roof Penetrating the RoofDamper Operation GAS LineTest for GAS Leaks Hearth ExtensionFinishing Your Fireplace Combustible AIR KITMantel AIR KIT OperationC12S-8DM, Also for Straight RUN Over 30 FT. Level To Install ElbowsComponent Parts Replacement Parts