Front Section Repair Kit Part Number
Installation — assembly
14.Insert draw rods. Make sure all sections are aligned when drawing together, tighten tie rod nuts evenly (35 + 5 ft. lbs. torque).
15.
16.Apply silicone sealant around vent ell and install, securing with screw (Series 1 & 2 only) (check that condensate drain hose is securely fastened).
17.Install studs for blower housing mounting bracket and block temperature limit switch.
18.Reconnect drain valve and piping on front section. See Boiler Manual.
a.Do not solder water tubing until Step 19 and all piping components are doped and tightened, alignment is critical.
b.When
19.Install circulator, assuring proper alignment of pump(s) to all circulator(s) flanges.
20.After all piping components are connected, then solder water tubing.
21.Pressure test block assembly and water tubing for leaks as described in Boiler Manual. Repair, if found.
22.Replace blower assembly and burner. See “Blower Assembly or Burner Replacement Instructions,” part number
23.Tilt block assembly back onto base rails.
24.Re-install:
Block temperature limit switch. Jacket left and interior panels. External relief valve piping.
External air vent piping. High limit control and well. External vent piping.
External combustion air piping, if used. Vent condensate drain hose.
External system gas and water piping to boiler. Control tray (if applicable).
All wiring connectors to control tray. Thermostat wiring.
25.Fill boiler as described in Boiler Manual.
26.Turn on electric and gas to boiler. Check boiler normal sequence of operation and follow checkout procedure in Boiler Manual.
27.Check for flue gas leakage around new section using mirror. Leaks will cause fog on mirror. Repair any leaks with silicone sealant and recheck.
28.Replace insulation and jacket right, back, front and top panels.