Nortec 1505691-B manual 21a 21b 21c 13a 13d 13e 13b 13c 11b 11a 12 12a 14a

Page 19

4

22

23

24

 

 

 

5

2

 

 

 

 

3

 

 

 

21a

 

17

16

18

21b 21c

 

1

7 6

13a

 

 

13d

 

 

13e

 

 

20

 

8a

13b

 

 

 

 

19

10

 

 

13c

11b

15

11a

14

11

8

9

12 12a

14a

- 16 -

Image 19
Contents Installation, Operation Maintenance Troubleshooting Guide Table Of Contents Page Receiving & Unpacking Equipment InstallationPRE-INSTALLATION Checkpoint Humidifier ConfigurationFigure #3 Wall Mounting Detail Cabinet Mounting of the Blower Pack Steam Hose InstallationCondensate Hose supplied Blower Pack ConnectionTable #1 Clearances of Remote Mounted Blower Pack Remote Mounting of the Blower PackWater Supply Line PlumbingDrain Line Page Resdelux Operation Control InstallationOperation IntroductionSteam Cylinder MaintenanceManual Capacity Adjustment When to Replace the Steam CylinderHOW to Install the Replacement Cylinder HOW to Remove the Steam CylinderExtended Shutdown Mandatory Cleaning of the Drain ValveDiagnostic Procedures Troubleshooting TroubleshootingUnit Status Lamp Symptom Corrective actions Yellow Green Procedures and Terms Used Diagnosing Page Page Item Number Part Number Description Spare Parts List and Exploded View Resdelux21a 21b 21c 13a 13d 13e 13b 13c 11b 11a 12 12a 14a Inspect, Check, Clean, and Adjust all items listed Periodic Maintenance ChecklistLimited Warranty MTH/DAY/YR