•Cover grill. To help keep out cold air you can use the optional plastic grill cover. This cover may be purchased from your local distributor. To install the cover, line up the grill cover with the grill so that the tabs on the cover will slide over the center section of the grill. Slide the grill cover onto the grill. The tabs will snap into place. To remove, just pull the grill cover straight forward away from the grill.
•Unplug unit from power supply during extended periods of
By following the operating, installation, and maintenance suggestions as outlined, you can get many years of efficient and satisfactory service from your cooler. In the event additional information is desired, your dealer will be more than glad to assist you in every possible way.
Vertical Duct Conversion
This window unit can be reconfigured to a vertical tunnel con- figuration for installation into smaller width openings. Follow the subsequent steps if this is desired. Note: Tunnel mount strips used to convert tunnel are not shipped with this cooler. If desired, call Customer Service at
1. Remove the 9 screws
4.Insert the flange of the tunnel between the front panel and the top pan. Line up the two larger holes in the tunnel with the center two holes of the top pan. (Fig 11).
5.Using the screws taken from the top pan, secure the tunnel to the unit. Do not tighten the screws, leave them loose until the rest of the tunnel has been secured.
6.Line up the three holes at the bottom of the tunnel with the holes in the front panel. Using the screws taken from the bottom of the tunnel pre- viously, secure the tunnel to the front panel.
7.Make sure all the screws re- moved from the top pan are in place and tighten all screws.
8.Skip this step for the RWC35 & RN35W models. Remove the three screws (2 in models WC37 & N37W) from each side of the front panel as shown in figure 12.
Fig. 10
Line up to the two
middle holes
from the sides and bot- tom of the tunnel.
2.Remove the top 4 mid- dle screws of the top pan while holding the tunnel in place (Fig 9). Be careful not to drop the tunnel, or damage to the electric cords
could occur. You may need to loosen other screws in the top pan
to make it easier to remove the tunnel.
3.Rotate the tunnel 90 degrees
CAUTION: Make sure that you do not remove the bottom most screw. It holds the blower housing in place.
9.To cover up the gap in the front panel, use the two strips of metal
obtained from Customer Service. |
|
|
Line up the holes in the metal strips |
|
|
to the holes in the front panel and |
|
|
secure them with the screws pre- | Do Not Remove |
|
viously removed in step 8. (See | Bottom Screw | Fig. 12 |
| ||
Fig. 12) Install the metal strips so |
|
|
that there is no gap between the |
|
|
top pan and the metal strip. If there is a gap, turn the metal strip around.
NOTE: When mounting a cooler with this type of vertical tunnel configuration, the unit should be supported by a flat support or stand. The installation method mentioned in the owner’s manual using chains and legs should not be used. The filler panels in the installation kit may be used to seal off the window above the cooler duct.
Wiring Diagrams
| Manual Control |
|
|
| Remote Control | |
Blower Motor |
|
|
| Ground | Control | |
Switch | Blower Motor | Screw | Ground | |||
| Plug |
|
| LockPlate | Wire | |
|
|
|
|
|
| |
Hi | Black |
| Hi | Black | w/ Grommet |
|
Red |
| Red |
|
| ||
Low |
| Low |
|
| ||
Green |
| Green |
|
| ||
Gnd |
| Gnd |
|
| ||
White |
| White |
|
| ||
Com. |
| Com. |
|
| ||
|
|
|
|
| ||
Pump |
|
| Pump |
|
|
|
Motor |
|
| Motor |
|
|
|
4 |
|