Essick Air RN50W Vertical Duct Conversion, Wiring Diagrams, Manual Control Remote Control

Page 4
Fig. 9
Remove top screws last. Do Not Drop Tunnel
Metal
Strip
Fig. 11

Cover grill. To help keep out cold air you can use the optional plastic grill cover. This cover may be purchased from your local distributor. To install the cover, line up the grill cover with the grill so that the tabs on the cover will slide over the center section of the grill. Slide the grill cover onto the grill. The tabs will snap into place. To remove, just pull the grill cover straight forward away from the grill.

Unplug unit from power supply during extended periods of non-use.

By following the operating, installation, and maintenance suggestions as outlined, you can get many years of efficient and satisfactory service from your cooler. In the event additional information is desired, your dealer will be more than glad to assist you in every possible way.

Vertical Duct Conversion

This window unit can be reconfigured to a vertical tunnel con- figuration for installation into smaller width openings. Follow the subsequent steps if this is desired. Note: Tunnel mount strips used to convert tunnel are not shipped with this cooler. If desired, call Customer Service at 1-800-643-8341 to have it shipped to you at no cost.

1. Remove the 9 screws

4.Insert the flange of the tunnel between the front panel and the top pan. Line up the two larger holes in the tunnel with the center two holes of the top pan. (Fig 11).

5.Using the screws taken from the top pan, secure the tunnel to the unit. Do not tighten the screws, leave them loose until the rest of the tunnel has been secured.

6.Line up the three holes at the bottom of the tunnel with the holes in the front panel. Using the screws taken from the bottom of the tunnel pre- viously, secure the tunnel to the front panel.

7.Make sure all the screws re- moved from the top pan are in place and tighten all screws.

8.Skip this step for the RWC35 & RN35W models. Remove the three screws (2 in models WC37 & N37W) from each side of the front panel as shown in figure 12.

Fig. 10

Line up to the two

middle holes

from the sides and bot- tom of the tunnel.

2.Remove the top 4 mid- dle screws of the top pan while holding the tunnel in place (Fig 9). Be careful not to drop the tunnel, or damage to the electric cords

could occur. You may need to loosen other screws in the top pan

to make it easier to remove the tunnel.

3.Rotate the tunnel 90 degrees counter-clockwise (Fig 10). Be care- ful as you rotate the tunnel that you don’t damage or disconnect the cords which are still connected to the controls and the front panel.

CAUTION: Make sure that you do not remove the bottom most screw. It holds the blower housing in place.

9.To cover up the gap in the front panel, use the two strips of metal

obtained from Customer Service.

 

 

Line up the holes in the metal strips

 

 

to the holes in the front panel and

 

 

secure them with the screws pre-

Do Not Remove

 

viously removed in step 8. (See

Bottom Screw

Fig. 12

 

Fig. 12) Install the metal strips so

 

 

that there is no gap between the

 

 

top pan and the metal strip. If there is a gap, turn the metal strip around.

NOTE: When mounting a cooler with this type of vertical tunnel configuration, the unit should be supported by a flat support or stand. The installation method mentioned in the owner’s manual using chains and legs should not be used. The filler panels in the installation kit may be used to seal off the window above the cooler duct.

Wiring Diagrams

 

Manual Control

 

 

 

Remote Control

Blower Motor

 

 

 

Ground

Control

Switch

Blower Motor

Screw

Ground

 

Plug

 

 

LockPlate

Wire

 

 

 

 

 

 

Hi

Black

 

Hi

Black

w/ Grommet

 

Red

 

Red

 

 

Low

 

Low

 

 

Green

 

Green

 

 

Gnd

 

Gnd

 

 

White

 

White

 

 

Com.

 

Com.

 

 

 

 

 

 

 

Pump

 

 

Pump

 

 

 

Motor

 

 

Motor

 

 

 

4

110496-1

Image 4
Contents Safety Rules WC37 N37W WC44 N44W WC46 N46W WC50 N50WRWC35 RN35W RWC46 RN46W RWC50 RN50W Serial #Cooler Installation OperationMaintenance Install float valve. InstallSpring Start-Up Winter Shut DownWiring Diagrams Manual Control Remote ControlVertical Duct Conversion Viously removed in . SeeLimited Warranty TroubleshootingProblem Possible Cause Remedy Parts Drawing / Dibujo De Piezas Replacement Parts List / Lista De Piezas De Repuesto Date of purchase / Fecha de compraEnfriamiento Por Evaporación Reglas De SeguridadOperación ¿Cuanto Debe Abrir Las Ventanas? InstalaciónEl Método De Champion De Equilibrar El Aire Instalar Las PatasMantenimiento Conectar El AguaPreparar La Unidad Para El Invierno Puesta En Marcha En La PrimaveraEsquemas Del Cableado Conversión Al Conducto VerticalControl Manual Control a Distancia La Localización De Averías Problema Causa Posible RemedioGarantía Limitada