Windsor GH3 manual Operation, Cleaning Procedure

Page 4

OPERATION

SELECT THE RIGHT CHEMICAL FOR THE JOB:

1.For greasy or oily soil – Use a heavy-duty degreaser.

2.For sealer or old wax - Use a heavy-duty stripper.

3.For soap residue and lime build-up – Use a mild acidic cleaner.

4.For routine maintenance – Use an all-purpose cleaner.

Consult your Windsor dealer for proper

chemicals. Always follow directions on the container of the chemical being used.

SELECT THE RIGHT BRUSH FOR THE JOB:

1.For routine maintenance use the Universal STANDARD Brush.

2.For cleaning groutlines use the Universal AGRESSOR Brush.

CLEANING PROCEDURE

1.Remove trash receptacles, etc., from the area to be cleaned.

2.Sweep or dust mop the floor.

3.Remove gum, labels or other debris from the surface with a scraper.

4.Apply the pre-mixed solution generously with a wet mop (or use optional tank) to a section of the floor. Let solution stand for 5 to 10 minutes. Do not allow solution to dry on the floor.

5.Plug the power cord of the machine into a properly grounded outlet.

6.Adjust handle to a comfortable height.

7.Depress the “ON” switch to start machine. (Depress the “OFF” switch to stop machine.)

The brush-drive motor is thermally protected and should an overload condition occur causing the

motor to stop, the machine will not start until the “ON” switch is depressed.

8.Start cleaning at the farthest corner and work toward the door. For best results, pull machine backwards at a steady pace.

9.Keep the machine moving to avoid possible damage to the grout.

10.Use a bristle hand brush to clean inside corners and small areas not accessible by machine.

11.After scrubbing, rinse floor with clean water. Use a wet vacuum to pick up loosened dirt an solution.

12.Groutlines will appear dark at first, but will lighten after they dry.

4

GROUTHOG 86038000 05/17/07

 

Image 4
Contents Grouthog Important Safety Instructions SafetyEquipment Setup InspectionElectrical Grounding InstructionsCleaning Procedure OperationMaintenance Wiring Diagram This page Left Blank Intentionally Grout HOG Assembly PRV no Description FRAME, GH3 Main