IMPORTANT: READ THESE INSTRUCTIONS CAREFULLY BEFORE PROCEEDING WITH THE INSTALLATION OF BOILER. POST INSTRUCTIONS NEAR BOILER FOR REFERENCE BY OWNER AND SERVICE TECHNICIAN. MAINTAIN INSTRUCTIONS IN LEGIBLE CONDITION.
NOTE: — The equipment shall be installed in accordance with those installation regulations in force in the area where the installation is to be made. These shall be carefully followed in all cases. Authorities having jurisdiction shall be consulted before installations are made.
All wiring shall be made in accordance with the National Electrical Code and/or local regulations.
SECTION I - INSTALLATION INSTRUCTIONS | Page 3 |
SECTION II - OPERATING AND SERVICE INSTRUCTIONS | Page 5 |
CLEARANCE REQUIREMENTS
|
|
|
|
|
|
|
|
|
|
| Approved for Closet & Alcove |
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
| Installation with minimum |
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
| For Service Accessibility clearance to combustible material* |
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
| LEFT SIDE |
| 18" |
| 18" |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
| RIGHT SIDE |
| 6" |
| 0" |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| TOP |
|
| 9" |
| 9" |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
| BOTTOM |
| 9" |
| 15" |
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| REAR |
|
| 0" |
| 0" |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| FRONT |
| For Door Removal - 24" | 2" Closet |
|
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
| 18" Alcove |
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| *Closet Installation Requires Two Ventilation Openings, one located at |
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
| top and one at bottom, each opening to have 25 sq. in. net free area. |
|
|
|
|
|
| |||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Water Flow Rate - | ||
|
|
|
|
|
|
|
| KW |
|
|
|
|
|
|
| Water | (GPM) Based on 20°F | ||
Boiler | DOE HEATING | AFUE |
| Amps | No. and Size | Recommended Power |
| Appx. Wt. | Temp. Rise and Boiler | ||||||||||
| Rating |
| Contents | ||||||||||||||||
Model | CAPACITY, BTU/HR | % |
|
|
| (240V) | of Elements | Supply to Boiler |
| Full (Lb.) | Capacity At | ||||||||
|
|
|
|
|
| (240V) |
|
|
| (Gal.) |
|
|
| ||||||
| 240V | 220V | 208V |
|
|
|
|
|
| Min.* | Max. Fuse |
|
|
| 240V | 220V | 208V | ||
|
|
|
|
|
|
|
|
|
|
|
| ||||||||
|
|
|
|
|
|
|
| Wire Size |
|
|
|
| |||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
412 | 41,000 | 35,000 | 31,000 | 100 |
|
| 12 | 50 | #6 AWG | 60 |
| 155 | 3½ | 4.1 | 3.5 | 3.1 | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
416 | 55,000 | 46,000 | 41,000 | 100 |
|
| 16 | 70 | #4 AWG | 80 |
| 155 | 3½ | 5.5 | 4.6 | 4.2 | |||
|
|
| |||||||||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
420 | 68,000 | 58,000 | 52,000 | 100 |
|
| 20 | 85 | #2 AWG | 90 |
| 155 | 3½ | 6.8 | 5.8 | 5.2 | |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
DOE Heating Capacities are shown. Where the boiler and piping are in the heated space, the boiler may be selected on the basis of the DOE Heating Capacity. Where a piping loss and/or a pickup loss will exist, add this loss to the building loss to determine the total heating requirements. Where a piping loss only will exist but cannot be calculated, multiply the calculated building loss by a 1.15 factor to determine the total heating requirement.
*For runs in excess of 50 ft. consult local or national electrical code.
Maximum Allowable Working Pressure: 30 PSI (Water Only)
Figure 1: Dimensions and Specifications
2