Baxi Potterton Cold HE A warranty Clearances, Top 200mm Bottom Left side 5mm Right Side Front

Page 7

5mm Min

 

 

 

450mm

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

450mm Min

For Servicing

Purposes

5mm Min

Fig. 4

In Operation

5mm Min

200mm Min

(300mm Min if

using 80/125mm

flueing system)

780mm

200mm Min

4.0Clearances

4.1For your Safety

1.This appliance must have been installed in accordance with the manufacturer’s instructions and the regulations in force.

2.Any modification that may interfere with the normal operation of the appliance without express written permission from the manufacturer or his agent could invalidate the appliance warranty. In GB this could also infringe the Gas Safety (Installation and Use) Regulations.

GB - Heating Industry definition meaning England, Scotland, Wales, Northern Ireland, Isle of Man and the Channel Isles

3.Your boiler must not be operated without the casing correctly fitted.

4.Do not interfere with any sealed components on this boiler.

5.Take note of any warning labels on your boiler.

6.Your boiler should have the following minimum clearances for Safety and Maintenance

(Fig. 34):-

Top

- 200mm

Bottom

- 200mm

Left side

- 5mm

Right Side

- 5mm

Front

- 5mm (In Operation)

-450mm (For Servicing)

7.If your boiler is installed in a compartment, do not use it for storage purposes. Do not obstruct any purpose provided ventilation openings.

8.Flammable materials must not be stored in close proximity to your boiler.

9.Avoid skin contact when your boiler is in operation, as some surfaces may get hot e.g. pipework.

10.Ensure that the flue terminal, outside the house, does not become damaged or obstructed, particularly by foliage.

11.It is important that the condensate drain system is not blocked, modified or damaged in any way as this would affect the operation of your boiler. Your installer should have insulated any exposed pipework.

© Baxi Heating UK Ltd 2008

7

Image 7
Contents User Guide Contents Quick Reference Guide Contact your InstallerCentral Heating & Hot Water Domestic Hot Water Troubleshooting Is the Room Thermostat if Is the Integral Timer on and calling for heat ?Fitted set high enough ? Central Heating System Pressure Repressurising the SystemTo Re-Pressurise the System Top 200mm Bottom Left side 5mm Right Side Front ClearancesFault Indication Table of Error CodesCare of the Boiler Legislation Setting the Timer Setting the TimerEmergency Faulty boilerIf you smell gas Please complete the boxes below Warranty & Service