Installation
Instructions
GREEN TEA | T010.730 | |
CENTRAL THERMOSTAT | ||
| ||
LESS VOLUME CONTROL |
| |
TRIM KIT |
|
Thank you for selecting
To ensure that your installation proceeds
Certified to comply with ANSI A112.18.1M ASSE 1016
M 9 6 8 0 2 1
ROUGHING-IN DIMENSIONS
|
| R510 | |
|
| 1/2 NPT | |
|
| R530 | |
|
| 3/4 NPT | |
200mm | |||
| |||
| |||
|
| R510 | |
|
| 1/2 NPT | |
|
| R530 | |
|
| 3/4 NPT | |
|
|
|
150mm
86mm
25mm
(1)
48mm to 68mm (2 to
Recommended Tools
Flat Blade Screwdriver | Phillips Screwdriver |
CARE INSTRUCTIONS:
To keep your new faucet looking new, please follow these simple care instructions:
DO: Simply rinse the faucet clean with clear water. Dry the faucet with a soft cotton cloth.
DO NOT:
Do not use any abrasive cleaners, cloths, or paper towels.
Do not use any cleaning agents containing acids, polish abrasives, or harsh cleaners or soaps.
Regular and routine cleaning will reduce the need for heavy cleaning and polishing. If heavy cleaning is required, the following procedures are recommended:
Remove as much surface dirt and film using clear water and soft cotton cloth (as described above).
Use any of the following to remove tough surface film and
Mild liquid detergents
Clear ammonia free liquid glass cleaners
Once clean, rinse faucet again with clear water to thoroughly remove cleaner or polish and blot dry with a soft cotton cloth.
Failure to follow these care instructions may damage the Faucet's finish.