Giant LP1000 Hydraulic System Set Up, Pressure Accumulator, Operation Operation and Maintenance

Page 3

“Hydraulic System Set Up”

Intake

Feed Tank

 

 

Bypass Return

 

1

Coarse Filter

5

LP1000 High pressure pump

2

Booster pump

6

High pressure gauge

3

Fine-particle filter

7

Excess, Safety valve

4Gauge to check input pressure

2.2Pressure Accumulator

The purpose of the pressure accumulator, if installed, is to damp pulsation from the high-pressure pump and thus avoid vibrations in the discharge line. Gas in the pressure accumulator should be pretensioned to 50-60% of the maximum operating pressure. The correctly pretensioned gas must be checked regularly (approx. every 2 months – see separate operating instructions for pressure accumulator if necessary.)

3.Operation

Operation and Maintenance

·Check pump oil level and if necessary fill up (refer to specification information on page 8).

First oil change to be made after 50 hours of operation; thereafter oil must be changed every 500 operating hours – or at least every 6 months, whichever comes first.

Caution when operating in damp places or with high temperature fluctuations. Oil must be changed immediately, should condensate ( frothy oil) occur in the gear end.

·Before the high pressure pump is started, the centrifugal pump must produce the min. intake pressure of 36.0 PSI (2.5 Bar.)

·Open discharge line (e.g. spray gun) to enable booster pump to vent the system.

·Open all regulator valves and other shut-off agents.

·Activate bypass system or switch pressure regulating valve to bypass to enable pressure-free start.

·Start motor briefly to check the direction of rotation. Pay careful attention to the direction of rotation that is specified for the pump (arrows indicated on crankcase.) To serve this purpose, the pump must only be dry run for a short period (approx. 30 sec.).

·Start the pump and let it run in pressure-free bypass operation for approx. 2 minutes to enable the automatic functioning seal cooling system to vent itself.

Important! A small portion of water from the suction chamber which runs through the seal sleeves and steel elbow pipes is led off to pass behind the high-pressure seals to cool these.

As a result of heat dissipation, the elbow pipes are approx. 41-50° F (5-10°C) warmer than the water temperature on the suction side.

Important! Check regularly to ensure elbow pipes do not overheat.

If pipes become very hot (indication of seal wear,) stop pump immediately and examine seals and plungers (see maintenance section.)

·Listen carefully for an even running sound. If the pump begins to run irregularly or pulsate strongly, it can be that one of the three plungers is not vented. In this case, the pump should be started and stopped at quick intervals to ease venting. Venting is also made easier if the vent tap in the discharge line is opened.

3

Image 3
Contents Updated 9/00 Discharge Line Set-UpandInstallationPump 1HydraulicConnections InletLineHydraulic System Set Up Operation Operation and MaintenancePressure Accumulator Inlet Valves Discharge ValvesTo Check Seals and Plungers To Dismantle Gear To Reassemble Gear End Model LP1000 Exploded View Position Item# Description Torque Amount Qty DescriptionSpecifications Model LP1000 High-Pressure Plunger Pump LP1000 Dimensions mm Giantindustrieslimitedwarranty

LP1000 specifications

The Giant LP1000 is a cutting-edge electric mountain bike that stands out in the world of cycling with its impressive features, innovative technologies, and remarkable characteristics. Designed for both professional riders and leisure enthusiasts, this bike caters to a wide range of cycling needs, offering a perfect combination of performance and comfort.

At the heart of the LP1000 is its powerful electric motor. This high-torque motor can deliver speeds of up to 28 miles per hour, making it an excellent choice for those seeking an adrenaline rush on rugged terrains. The robust 500Wh lithium-ion battery ensures that riders can enjoy significant range with a single charge, allowing for extended rides without the constant worry of running out of power. The battery is seamlessly integrated into the frame for a sleek aesthetic and is easily removable for convenient charging.

The bike features a lightweight aluminum frame that strikes a balance between durability and weight. This construction not only enhances performance during climbs but also ensures a nimble ride on descents. The geometry is tailored to provide optimal stability and control, making it suitable for various riding conditions, from trails to urban environments.

The LP1000 is equipped with an advanced suspension system that includes a front fork with adjustable compression and rebound settings. This allows riders to customize their riding experience based on personal preferences and the specific challenges of the trail. The rear suspension is designed to absorb shocks and bumps, providing a smooth ride over rough surfaces.

When it comes to braking systems, the LP1000 does not disappoint. It boasts hydraulic disc brakes, offering superior stopping power even in wet and muddy conditions. This feature enhances the bike’s safety and reliability, allowing riders to navigate technical descents with confidence.

Additionally, the bike is outfitted with cutting-edge smart technology. It includes a digital display that provides real-time updates on speed, distance traveled, battery life, and more. This information allows riders to monitor their performance and make informed decisions during their rides.

Overall, the Giant LP1000 is a versatile electric mountain bike that embodies the perfect blend of power, comfort, and technology. Whether tackling challenging trails or commuting through the city, riders can count on the LP1000 for an exhilarating and enjoyable biking experience. With its impressive features and modern innovations, it represents a significant advancement in electric bike design, appealing to a broad spectrum of cycling enthusiasts.