Tighten the tensioning screws.
Install the connecting hoses on the valves with the compression fittings (included). Take care that the hoses do not twist.
Install the
Cnnect the valves to the supply stops with 1/2” supply lines and nuts (not included).
Turn on the water and check all connections for leaks.