Bunn LPG-2, G9WD, G9-2T DBC service manual Rectifier Models G1 MD, FPG-2 DBC

Page 38

SERVICE (Cont.)

Rectifier (Models G1 MD, FPG-2 DBC)

FIG. 36 RECTIFIER

P1706

 

Location:

The rectifier is located inside the grinder housing mounted on the rear of the motor mounting bracket for models G1 MD and on the component mounting bracket for model FPG-2 DBC.

Test Procedures:

1.Disconnect the grinder from the power source.

2.Remove the red wire and the black wire from the rectifier.

3.Check the voltage across the (+) and (-) termi- nals on the rectifier with a voltmeter. Connect the grinder to the power source and start the grinder motor. The indication must be approximately 108 volts dc.

4.Disconnect the grinder from the power source.

If voltage is present as described, the rectifier is op- erating properly.

If voltage is not present as described, refer to the grinder wiring diagram and check the grinder wiring harness.

Removal and Replacement:

1.Disconnect the wires from the rectifier.

2.Remove the #10-32 screw securing the rectifier to the motor mounting bracket.

3.Remove the rectifier and discard.

4.Install new rectifier on the rear of the motor mount- ing bracket and secure with a #10-32 screw.

5.Refer to Fig. 37 and reconnect the wires.

BLK from Motor (+)

BLU to BLU from Motor (AC)

WHI from Main Harness (AC)

RED from Motor (-)

 

A

+

C

 

 

A

 

C

 

P1381

FIG. 37 RECTIFIER TERMINALS

 

38

41545 122209

 

Image 38
Contents Post Office BOX SPRINGFIELD, Illinois Phone 217 529-6601 FAX 217BUNN-O-MATIC Commercial Product Warranty Contents Introduction Recommended Daily CleaningCapacity Chart Housing. Figure G9 WD Packaging & Shim RemovalModel G9WD Model G9-2Models LPG, LPG-2E Model G9Models G1, G2, G3 & G2 trifecta Power ON/OFF Pad e 100V Models Operating Controls Model MHGPressing Grind initiates a timed grind cycle Batch Selector SwitchPressing the pad allows programming access see Hopper/Batch Selector Pads dProcedures Problem Probable Cause RemedySwitch for testing procedures Volts for 230 volt modelsTroubleshooting From hopper Placement proceduresHoppers Supplies of whole bean coffeeProblem Probable Cause Remedy Accompnting the grinderComponent Locations ServiceComponent Access CUP Sensor Switch Model G2 Trifecta ServiceBAG Sensor Switch Models G1, G2, G3 or Remove the electrical access panel at the rear of the motor AC Motor and Grind ChamberInstall shear plate Install burr rotor cup AC Motor and Grind ChamberGrind Chamber Components DC Motor and Grind Chamber G1MD only DC Motor and Grind Chamber G1MD only DC Motor TerminalsMotor and Grind Chamber Removal Motor Models LPG & FPG MotorSolenoid and Gates Install load disc 11 flat side towards rotor ROTOR/AUGER, Burrs and Motor CoverDechaffer Models LPG & FPG DechafferMarathon Motor Motor Models G9, G9-2, MHGFranklin Motor Replace if excessively worn or damaged Remove and inspect stationary burr9 for wearSnubber Models G9, G9-2, MHG LocationLevel 2 Functions Grinder Scale Model G9WD onlyCalibration Capacitor Model LPG only Capacitor TerminalsCircuit Breaker Models LPG, LPG-2E, FPG, FPG-2 DBC Circuit BreakerHopper Selector Switch Model LPG-2E only Viewed from rearHopper Selector Switch Model G9-2 only Refer to Fig. below when reconnecting the wiresGrinders with Analog Timer OFF/ON/START SwitchGrinders with Digital Timer OFF/ON/START Switch TerminalsURN/CARAFE Switch Terminals Urn/Carafe Switch Models G9, G9-2Refer to the illustration below when reconnecting the wires Batch Selector Switch Terminals Batch Selector Switch Model FPGBatch Selector Switch Potentiometer Model FPG Potentiometer TerminalsRectifier Models G1 MD, FPG-2 DBC RectifierRelay Test Procedure Disconnect the grinder from the power supplyRelay Early Model G-9 Relay TerminalsRemove the white/red wires from relay contacts 7 Relay Models G1, G2, G3, G2 trifectaRelay Early Models Late ModelsRelay Models MHG, FPG-2 DBC, Late Model G-9, G9-2, G9-2 DBC Hopper Slide Plates Slide plates must always remain flat for proper operationHopper Slide Plates Models MHG Solenoids Models MHG, FPG-2 DBC, LPG-2, G9-2, G9-2 DBC SolenoidsTimer Model LPG-2E Place the hopper selector switch in the left posi- tionTimer Models LPG, FPG Timer Model G9 Timer TerminalsTimer Model G9-2 TimerControl Board Model MHG Control Board Terminals Refer to when connecting wiresControl Board Membrane Switches Model MHG only Nuetral Membrane SwitchMembrane Switch EMI Filter Models FPG & FPG-2 EMI Filter TerminalsFunnel Sensing Coil Models MHG & G9-2 DBC Memory Clock Board Model MHG Disconnect the harness from the memory clock boardDisplay Board Model MHG Triac MAP for MHG MOV1Controls Relay @ J1-2 Triac MAP for FPG-2 DBC and G9-2 DBCControls Left Gate @ J1-1 Controls Right Gate @ J1-350/60 HZ Wiring DiagramsWire Single Phase Relay Coil WHI/GRN Volts AC Wire Single Phase 50 HZSchematic Wiring Diagram MHG Volts AC, 120 Volts AC Wire + GndSingle PHASE, 50/60HZ Volts AC Wire Single Phase 60 HZWiring Diagrams Wiring Diagrams Schematic Wiring Diagram LPG Wiring Diagrams Schematic Wiring Diagram LPG-A Wiring Diagrams Schematic Wiring Diagram LPG W/CapacitorWiring Diagrams Schematic Wiring Diagram LPG-B Schematic Wiring Diagram G1, G2, G3 & G2 trifecta Volts AC Volts AC Wire Single Phase60 HZ Schematic Wiring Diagram G9A HD 50 HZBLK WHI/RED WHI/YEL WHI/BLU SCHEMATICWIRINGDIAGRAMG9-2A HD Wiring Diagrams FPG FpgaWiring Diagrams 60 HZFPG-2A DBC
Related manuals
Manual 79 pages 39.46 Kb Manual 2 pages 51.11 Kb

FPG-2, G1, FPG, G9-2T DBC, G9-2 specifications

Bunn has established itself as a leader in the coffee and beverage equipment industry, providing advanced solutions that cater to a variety of needs. Among its notable products are the Bunn LPG-2, G9, FPG-2, G9-2, and G9WD, which showcase the company’s commitment to innovation, quality, and efficiency.

The Bunn LPG-2 is an ideal solution for high-volume coffee production. This model features a two-watt heating element that ensures rapid brew cycles and consistent temperature control. With a sleek design and user-friendly interface, the LPG-2 simplifies the brewing process while delivering exceptional coffee quality. Its large capacity enables institutions to serve multiple customers simultaneously, making it suitable for restaurants, cafes, and hotels.

The G9 series, particularly the G9 and G9-2, are known for their versatility and robust performance. Both models come equipped with a stainless steel hot water faucet, allowing users to draw hot water for various applications such as tea or soup preparation. The G9 model is designed for single-brew operation, while the G9-2 accommodates dual brewing, making it an efficient choice for those needing to meet demand quickly. Additionally, both G9 models have advanced brewing technology to ensure optimal flavor extraction.

The FPG-2 model stands out for its precision and control over brewing parameters. It features a touchscreen interface that allows users to customize brew strength and temperature, ensuring that each cup meets individual preferences. The FPG-2 is also remarkably user-friendly, which is essential in a busy environment. Its dual-brew functionality allows it to serve two different coffee options simultaneously, enhancing service efficiency.

The G9WD is designed for those who require the ultimate convenience. Featuring a built-in water line connection, the G9WD minimizes the need for manual refilling, ensuring a continuous supply of fresh coffee. This model is equipped with a programmable timer, allowing users to set brew cycles in advance, which can be a significant time-saver during peak hours.

In summary, the Bunn LPG-2, G9, FPG-2, G9-2, and G9WD offer a range of features that cater to various coffee brewing needs. With advanced technologies, efficient designs, and user-centric interfaces, these models are engineered to deliver consistent, high-quality beverages, making them essential tools for any coffee-focused establishment. Whether for high-volume brewing or versatile beverage options, Bunn's offerings stand out in the competitive landscape of beverage equipment.