Hoshizaki HNC-210BA-L/R-S, HNC-150BA-L/R-S, HNC-120BA-L/R-S, HNC-180BA-L/R-S Final Check List

Page 8

6. FINAL CHECK LIST

1)Is the showcase level?

2)Is the showcase in a site where the ambient temperature is within 50°F (10°C) to 80°F (27 °C) all year around?

3)Have all shipping carton, evaporator spacer, tape(s) and packing been removed from the showcase?

4)Have all electrical and piping connections been made?

5)Has the power supply voltage been tested or checked against the nameplate rating?

6)Has the user been given the instruction manual and instructed on how to operate the showcase and the importance of periodic maintenance recommended?

7)Has the user been given the name and telephone number of the authorized service agency?

5

Image 8
Contents Counter Showcase Hoshizaki AMERICA, INC Contents General Information Construction Location SET UP Electrical Connections Drain ConnectionsFinal Check List Start UP Page Drain Pipe Cleaning INTERIOR/EXTERIORCondenser Checking Ground Fault InterrupterAIR Filter