Grindmaster 21, 20, 10 instruction manual Control Board Settings

Page 9

CONTROL BOARD SETTINGS

J1 Jumper should remain on pin 1 & 2

J2 Jumper Controls

-No pin connected with jumper-No minimum brewing temperature

-Jumper connecting 2 & 3 - Low temperature no brew. The brewing cycle with wait until

temperature of water is ready before continuing (factory setting)

-Jumper connecting 1 & 2 - Disables thermister, unit must use a thermostat to operate properly (not normally used)

Number 1 pins

Jumper J1

Jumper J2

English

Page 8

Grind ’n Brew Coffee Systems

Image 9
Contents GRIND’N Brew Coffee System Page Technical Data Export Models Water Hook-up All Models Brewing GRIND’N Brew Timer settings/ with new PDS Flow control valve Figure E Figure G Control Board Settings 185ÞF/85ÞC Oz 100 grams of coffee English English English English SWITCH, Snap Action English English